BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2025 at 7:00 PM

Updated March 1, 2025

Renovation of a detention facility in Plymouth, Minnesota. Completed plans call for the renovation of a detention facility.

Adult Correctional Facility Boiler Heating Upgrades Phase 2 The project will involve installing two additional dual-fuel natural gas/fuel oil condensing boilers, which are currently stored on-site. These boilers will be moved into the boiler room and installed with new circulation pumps. The facility will transition from steam and steam-to-hot-water heat exchangers to a hot water-only system. This transition includes integrating hot water piping into the existing infrastructure connected to the steam-to-hot-water heat exchanger serving the Women's Facility, which will be decommissioned as indicated in the mechanical plans. The general contractor will also remove the two existing steam boilers to make space for the new hot water boilers. The contractor is responsible for connecting to the existing tie-in points in the new dual-fuel boiler heating water loop. They will provide and install hot water pumps and all necessary appurtenances as specified in the plans. Distribution piping for the hot water system will be installed to new fin tube radiation and to ten new AHUs, as outlined in the plans. Additionally, two new AHUs will be installed at the Women's Facility, and the variable air volumes (VAVs - 66 total) in the Women's Facility will need to be rebalanced. Nine AHUs at the Mens Facility and two at the Women's Facility will be removed. The contractor must provide a phasing plan for staging the AHU replacements at both facilities. A new chilled water plant will also be installed as part of this project, with associated system pumps and appurtenances to be supplied and installed by the contractor. The chilled water plant will consist of (2) new chillers and relocating the existing chiller serving the cell block Small Business Participation: 8% for Small Minority-Owned Businesses (SMBE) 10% for Small Women-Owned Businesses (SWBE) Workforce: 32% minority workforce 20% female workforce Workforce Entry Program: 1,360 total hours The Owner's estimated construction cost for the Work is $5,500,000 The Owner's estimated timeframe for the Contractor to substantially complete the Work is 365 days Question Deadline 12/20/2024 at 4:00 PM CT have any questions or have process issues with The McDowell Agency, Inc. please contact: Tim Landsberger Vice President tal@mcdowellagency.com 651-644-3880

Post-Bid

Jails / Prisons

$5,500,000.00

Public - County

Renovation

83

18

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
166
Bidding Soon
1,626
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 2, 2025

March 3, 2025

Project location map

1145 Shenandoah Ln N, Plymouth, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.