BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Site work, paving and outdoor lighting for a mixed-use development in Miami, Florida. Working plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

No Bids Received District - 06 Prequalification Requirements : Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Selection Method : Low Bid Project Description : Wrong-Way Driving (WWD) Contract Amount/Limit: $5,538,988 Estimated Contract Time: 600 calendar Days All questions for this project must be submitted through the Department's Bid Question and Answer website at: FDOT - BID Q&A. Reference appropriate Contract Number E6P01. LBDB Qualification Validation Form Due Date 1/17/2025 03:30 am Tech Proposal Due Date/Time 1/21/2025 10:30 pm Technical Review Committee Meeting 1 Date/Time 1/28/2025 12:30 am Final Selection Date/Time 2/03/2025 08:30 pm FDOT - RFP D/B - Wrong-Way Driving (WWD) The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive Bids and Proposals from Proposers for the design and construction of Wrong-Way Driving (WWD) Advanced Countermeasures at various Interchange Exit Ramps in Miami-Dade County. In accordance with FDOT's WWD initiative, the following 15 ramps have been identified for implementation of WWD countermeasures: - SR 826 / Palmetto Expressway SB off-ramp to EB SR 90 / SW 8 Street - SR 856 / William Lehman Cswy WB off-ramp to West Country Club Drive - SR 826 / Palmetto Expressway SB off-ramp to Coral Way - SR 9A / I-95 NB off-ramp to NW 62 Street (Exit 6A) - SR 9A / I-95 NB off-ramp to SR 916/NW 135 Street (Exit 10B) - SR 93 / I-75 NB off-ramp to SR 860/NW 186 St/Miami Gardens Dr - SR 9A / I-95 NB off-ramp to SR 924/NW 119 Street (Exit 9) - SR 826 / Palmetto Expressway EB off-ramp to NW 37 Avenue - SR 826 / Palmetto Expressway SB off-ramp to NW 138 St - SR 9A / I-95 NB off-ramp to NE 203 St (Exit 16) - SR 826 / Palmetto Expressway WB off-ramp to NW 47 Avenue - SR 826 / Palmetto Expressway WB off-ramp to NW 37 Avenue - SR 9A / I-95 NB off-ramp to SR 934/NW 79 Street (Exit 7) - SR 9A / I-95 NB off-ramp to SR 922/NW 125 Street (Exit 10A) - SR 112 / I-195 / Julia Tuttle Cswy WB off-ramp to SR 5/Biscayne Blvd

Final Planning

Roads / Highways

$5,538,988.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

4271

11

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
106
Bidding Soon
1,712
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.