BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Miami, Florida. Completed plans call for the renovation of a transportation facility; for site work for a transportation facility; water / sewer project; and water / sewer project.

Metrorail Bathroom Rehabilitation In Addition, the Contractor is Required to Have a Minimum of Three Years of Experience With Architecture, Structural, Hvac, Electrical, Plumbing, Fire Alarm and, Building Technology. If You Have Any Vendor Registration Questions Please Contact Vendor Assistance at (305) 375-5773. The Types of Contracts Available Under the Mcc Program Are Construction Projects, Facility Repairs, Neighborhood Improvements, Emergency Repairs and Maintenance Work With a Maximum Value of $5.0m; Ord 09-101. Projects. Contractual Opportunities Are Continuously Available for All Businesses Located in Miami-dade Who Are Interested in Doing Business With the County. Registering With Miami-dade County Must Be Done via Miami-dade County's Automated Web-based Vendor Registration Portal. All Capital Departments Are Participating. Additional Opportunities Are Available Through Weatherization Assistance Program (Wap) Which Enables Low-income Families to Reduce Their Energy Bills by Making Their Homes More Energy Efficient. Funds Are Used to Improve the Energy Performance of Dwellings by Families in Need, Using the Most Advanced Technologies and Testing Procedures Available in the Housing Industry. Measures to Make Homes More Energy Efficient Include: Replacement or Installation of Key Components, Installation of Energy Recovery Ventilation Systems Including Bathroom and Kitchen Exhaust Fans and Installation of Whole Mechanical Exhaust Systems to Provide Better Indoor Air Quality, Install Attic Insulation, Install Window Solar Films, Repair or Replace Inefficient Cooling Units, Repair or Replace Water Heaters and Address Air Infiltration With Weather Stripping, Caulking Thresholds, Minor Wall Repairs, Ceiling and Floors, Windows and Doors. Scope of Work. A V a I L a B L E Mcc 7360 Plan - Request for Price Quotation (Rpq) 1) Department of Transportation and Public Works- Bryan Rodriguez- Telephone No.: (305) 375-5301. Rpq No. Tp-0000027284 - Metrorail Bathroom Rehabilitation Estimated Cost: $556,712.90 License Requirement: General Engineering Scope of Work: Work Under This Contract Includes the Remodeling of Certain Restrooms Facilities Within the Uhealth | Jackson, Palmetto and Tri-rail Metrorail Stations. Scope is Identified in the Construction Documents and Associated Specifications for Each of the Facilities; However, It Includes and is Not Limited to: 1) the Removal and Installation of All Fixtures and Finishes Complying With Codes and Ada Standards. 2) Removal and Replacement of All Finishes and Fixtures With New Walls, Floor, and Ceiling Coverings, Fixtures, Appurtenances, Plumbing, Electrical, Mechanical, Communications, P/a Speaker and Speaker Grills, Hand Free Telephones, Building Systems, Equipment and Components Associated Thereto for the Complete Repair of the Metrorail Bathroom Projects. 3) Remove and Replace With New Cast-iron and Copper All Existing Sanitary Drains, Waste and Vent Systems. 4) Remove and Completely Re-pipe With New L-type Copper All Existing Water Pipe, Including Trap Primers, Control Valves, and Supports for All Plumbing Fixtures. 5) Provide New Plumbing Fixtures "institutional Type" Ada and Water Sense Compliant. Contractors Are to Verify That the Specified Products, in the Construction Documents, Are Water Sense Compliant. Contractors Are to Provide Cut Sheets for Approval of All Plumbing Fixtures. In the Event That Some Plumbing Fixtures, as Specified, Are Not Water Sense Compliant, Contractor is to Submit to Dtpw Substitutions of Equal or Greater Performance With the Appropriate Water Sense Certifications. 6) Provide to All New Plumbing Fixtures Acorn Duran-ware 16-gauge, Type 304 Stainless Steel Rated for 1000 Lbs. With All Mounting Screws Concealed. 7) Restrooms Shall Be Equipped With as Required Per Dtpw Toilet Accessory Specifications. 8) All bathroom's walls shall be tile from floor to ceiling with ceramic tile: Daletile, Marrazzi & American Olean, Ice White 0025, Glossy with Epoxy integral color grout, color: 44 Bright white. 9) Bathroom floors shall be anti-slip ceramic tile. Daletile: Marrazzi & American Olean, Story Floor 0034, Matte Balance with epoxy integral grout: laticrete epoxy grouts, 78 sterling Silver. 10) Provide new mechanical soffit and rigid ceiling with fire alarm and lighting. 11) Install doors type 316 stainless steel with a min. of a 1.5-hour fire rating. 12) Provide light fixtures per specification in day brite LED with emergency battery back-up shall be 227V, 2 lamp recessed to match existing. 13) Furnish and install a new UL listed weather resistant wall mounted hand-free telephone to replace existing one. 14) Furnish and install a new exhaust ventilator with duct and wiring, in each restroom. 15) The smoke detectors inside the bathrooms must be removed at the beginning of the construction and reinstall before opening the bathroom to the public. 16) The P/A speaker, speaker enclosure and grill shall be replaced with a new atlas sound speakers to be compatible with existing P/A system. 17) Remove and replace lose / broken floor tiles in area adjacent to the area of work. 18) Remove and replace the existing Removal and replacement of existing O/A wall vent. 19) Remove and replace cracked lath and plaster ceiling and high hats above drinking fountain vestibule. 20) New concrete work as shown in the structural drawings Contractor Must Refer to the Request for Price Quotation (Rpq) and Associated Project Documents for the Detail Scope of Work. Experience Requirements: in Addition to the Required Licenses, Bidders Must Be Able to Demonstrate, Through Prior Experience, the Ability to Construct Projects of Similar Size and Scope, as Described in the Project's Summary of Work and Identified in the Construction Documents. Proposers Shall Provide Documentation That Demonstrates Their Ability to Satisfy All the Minimum Qualification Requirements. Bidders Who Do Not Meet the Minimum Qualification Requirements or Who Fail to Provide Supporting Documentation May Not Be Considered for Award. The Contractor Must Be Able to Pull in a Master Permit. Pre-bid Meeting notes Then, for Site Visit's Purposes, Will Proceed to Second Location at: Tri-rail Metrorail Station, 2567 East 11th Avenue., Hialeah, Fl 33013" and Will End at Third Location: Palmetto Metrorail Station, 7701 Nw 79 Av, Miami, Fl 33166 Site Visit Will Be Held Immediately After the Pre-bid Meeting. Additional Site Visit Meetings May Be Scheduled Based on the Number of Rsvps Received. If Additional Site Visit Meetings Are Scheduled, Dtpw Will Notify the Prospective Bidders in Writing.

GC Bidding

Transportation Terminals

$556,713.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
47
Bidding Soon
1,095
All Active Projects
488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2025

October 20, 2025

img_map_placeholder

Multiple Locations, Miami, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.