BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Brighton, Alabama. Contact the soliciting agency for additional information.

Scope of Work 1. Communication and Traffic Control: o Communicate with mayor or designated city official on the scope of work, time schedules and work areas to be blocked off from daily traffic. 2. Debris Removal: o Remove excess rock, dirt, and debris approximately 5 ft. deep or lower than the drain that has eroded to the bottom of the creek. 3. Cleaning under bridges and underpasses: 4. Grading and Cleaning Creek Sides: o Grade and clean the sides of the creek from trash and trees that may impair the movement of water during rain. 5. Work Area: o Begin at Hoadley St, continue through Main St, Ross Ave, St. Julian St, Bessemer Ave, Brighton Ave, Patton Ave, Dolomite Ave, Parker Springs St, and finish at Oakmont St (approximately 1 mile). 6. Site Cleanup: o Clean the job sites of all related debris upon completion of the above-described work. Proposal Requirements: o Company Information: Provide company name, address, contact information and a brief history of the company. o Experience: Detail relevant experience with similar projects, including references. o Project Plan: Outline the approach to completing the project, including a timeline. o Cost Proposal: Provide a detailed cost breakdown for the project. o Warranty: Include informant on warranties for work and materials. o Insurance: Provide proof of general liability and workers' compensation insurance. For questions or additional information - Brighton City Clerk (205)425-8934 or cityofbrighton@att.net. The City of Brighton reserves the right to reject any and all proposals. All work and materials must come with a full five-year unconditional warranty.

Sub-Bidding

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
32
Bidding Soon
596
All Active Projects
234
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2024

December 30, 2024

img_map_placeholder

Multiple Locations, Brighton, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.