BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Windsor, Connecticut. Completed plans call for the renovation of a multi-residential development.

For further questions; please contact Tom Foley, Signal Rock Consulting, Rehabilitation Consultant, 14 Pauline Street Milford, CT 06460 Office # (203) 446-6468 The following is an outline of the Scope of Work. This Scope of Work includes all labor and materials required to perform the construction work as described below. The contractor is responsible for obtaining permits; providing complete, thorough, and compliant services to all work; and for coordinating as appropriate with the work of all other trades specified elsewhere. All work must be performed in compliance with all applicable National, State, and Local Codes. 1) Deck Replacement A. Demo and rebuild entire rear deck approx. 12' x 15". a) All material to be pressure treated b) Match existing size and location c) Replace all footings per code d) Install new legder and flashing at house. e) Install 5/4" PT decking and rails f) Stair rail to include handrail g) Remove and replace existing concrete stair footer/pad i. ii. 2) Gutters All work to be performed per building code requirements Refer to specifications for all work A. Remove existing gutters and leaders a) Install new seamless white aluminum ogee style gutters b) Utilize appropriate hangers c) Install new white aluminum leaders d) Connect to existing drains or supply splash blocks accordingly 3) Doors- Division 7 A. Install new A facade entry door (verify size and handing) a) Remove and dispose existing door, jamb and storm b) Therma-Tru " Smooth Star" Energy Star or an approved equal c) Provide similar glass configuration to match existing doors per owner d) Double bore with Reeb On Guard composite jambs e) Provide new Schlage entry door hardware f) $180.00 maximum hardware budget) g) Plymouth, Wakefield, Camelot or Ashcroft collection h) Paint door and jamb as per manufacturers recommendations, including interior and exterior trim, owner to choose color and sheen 4) Flooring-Division 7 a. Provide and install new vinyl resilient plank flooring in the kitchen, hallway, all closets and living room, bathroom and bedrooms. a) Relocate appliances to install flooring; refrigerator, range & dishwasher b) New flooring shall be installed under the appliances c) Provide and install new vinyl resilient plank flooring (uni click) d) Manufactured by Traffic Master Allure Ultra e) Owner to choose color and style, maximum $3.70/S.F. material allowance f) Provide all necessary transitions or terminations i. The contractor shall custom make oak transitions at the existing dining room hardwood floor to minimize trip hazard ii. iii. Install new paint grade base board and (door casing if required), match existing Install new toe kick at kitchen cabinets b. Refer to manufacturer specifications for all work 5) Overhead Doors (Division 8) A. Remove existing overhead doors and associated hardware including tracks. B. Provide and install (2) new overhead Doors (verify dimensions) a) Single layer construction garage door b) Wayne Dalton Model 8000 or an approved equal c) No Windows d) Door installation to include new tracks, springs and mounting hardware e) Install continuous weather-stripping at perimeter of door f) Match existing window configuration. g) Owner to choose color from standard color line. C. Include (1) 1/2 hp garage door openers D. Refer to specifications for all work E. All work to be performed to code requirements 6) Windows- Division 7 (Alternate 1) A. Remove and replace yhe following windows. a) A facade- 4 DH windows b) C facade- 1 DH windows, Casement (kitchen) i. ii. Ensure proper vapor berries and insulation at cavities. ACS wrap all exterior trim after installation, buildout as needed iii. Install all framing to properly set and secure new window Paint or stain new or disturbed work All windows to have the energy star glazing package). All units to be white All operable units to include full standard fiberglass mesh screens

GC Bidding

Multi-Residential

$32,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
486
Active Projects
223
Bidding Soon
3,786
All Active Projects
1,726
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

December 16, 2024

img_map_placeholder

22 Devin Way, Windsor, CT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.