BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 13, 2024 at 7:00 PM

Updated December 14, 2024

Renovation of a mixed-use development in Medford, Oregon. Completed plans call for the renovation of a educational facility.

Halo Detector Installation This project may be awarded to a contractor based on the lowest bid. The district reserves the right to(1) reject any Proposal not incompliance with all prescribed public bidding procedures and requirements, (2) to add to the price bid by nonresident bidders an increase equal to the percent preference that the nonresident bidders home state would give it's instate bidders, (3) to reject, for good cause, any or all Bids that are not in the best interest of the district, (4) to reject any or all proposals, in whole or in part, to waive any formalities and to delete items prior to making the award, whenever it is deemed in the sole opinion of Medford School District to be in its best interest. Question Deadline 11/21/2024 at 2:00 PM PT All breakers are to be sized no larger than full load as listed on the equipment. If it is not factory installed, there shall be a disconnecting means installed at the equipment and shall be rated for wet locations. The disconnecting means shall be of the knife blade type. Where approved by the facility manager or maintenance manager it shall be acceptable to leave the existing breaker at the service if it is larger than the size listed on the equipment, as long as wire size is correct, stranded and in good condition. A fused disconnecting means shall be installed at the equipment that is fused not larger than the maximum amperage listed on the equipment. Conduits are to be continuous from enclosure to enclosure, there is to be no separation in conduits. This includes but is not limited to existing conduits. All conduits installed in locations subject to wet or damp locations shall have fitting listed for wet locations. All conduits shall be supported at maximum intervals of 10 feet where installed and mounted to the building structure. Where conduits are installed on stand-off devices and are EMT, they shall be supported at intervals not to exceed 5 feet. "Nailers" are not acceptable as support for conduit. Only one hole straps, two hole straps, Kindorf or strut clamps, and conduit hangers will be used to support conduit and shall be fastened to the structure with screws, bolts or expandable fasteners. Where flexible conduits are installed they shall have an outer liquid tight, nonmetallic, sunlight-resistant jacket over an inner flexible metal core. All fittings associated with flexible conduit shall be steel. Thomas and Betts or equivalent. Conductors are to be installed from the breaker continuous to the equipment disconnecting means, no splices are allowed. There shall be an equipment ground installed from where the branch circuit feeds the installed equipment and it shall be of the size listed in table 250-122 of the NEC. All conduits shall have an equipment ground installed and shall be of the correct size as listed in table 250- 122 of the NEC. All conductors shall be sized according to the NEC and shall be stranded copper. All work shall be in a neat and workmanship like manner and shall comply with the NEC. Everything must properly identified, both wire and disconnecting means. Any change or deviation in this procedure will need to be approved by Facilities Manager.

Bid Results

Educational

$31,300.00

Public - City

Renovation

22

3

6

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
7
Bidding Soon
174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

December 23, 2024

Project location map

To Be Determined, Medford, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.