BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fitness / recreation center in Nakusp, British Columbia. Completed plans call for the renovation of a fitness / recreation center.

The Nakusp Hot Springs were built in 1974 and have not been substantially changed since then. The current diesel boiler is at the end of its service life. This RFP is for upgrading the boiler to a liquid-to-liquid heat pump. The heat pump should use the hot springs water as its source and tie into the existing domestic hot water plumbing and the radiant floor heating. The Nakusp Hot Springs has a natural source of hot water. It flows in the building at about 150 LPM at a range of 32C – 47C depending on the point in the plumbing. There is a circulation loop of 50mm pipe from the hot springs water exit tank to the mechanical room. It currently feeds a heat exchanger that pre-warms the domestic hot water supply but there is additional capacity available. The water in this loop is approximately 32C. The main hot springs water passes within 3m of the mechanical room in an exposed pipe running along the basement ceiling. The water in the pipe is about 47C and there is some capacity to use the water for the heat pump. The maximum flow of either of these pipes is 150 LPM although there is not this amount available for heating from the hot springs source pipe as most of it enters the hot springs pools. The existing boiler and hot water tanks are shown in Schedule A. The current boiler is a Heiztechnik GmbH Wetzlar G305-7 with a maximum output of 393,000 BTU/hr. It is used in conjunction with two Allied Technologies “Super Hot” EPP-120 heat exchanger tanks to preheat the water supply. Hot water demand comes from twelve showers, five bathroom sinks, three utility sinks, and the radiant floor system inside the building. The proponent is responsible for verifying the suitability of any existing equipment and hot water demand. The ideal timeline will see the heat pump installed during the spring shut down in late April 2025 if a significant service interruption is required. An alternate proposal may be accepted if it has an equivalent energy efficiency. Question Deadline 11/29/2024

Post-Bid

Fitness / Rec Centers

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
1
Bidding Soon
36
All Active Projects
14
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

January 20, 2025

img_map_placeholder

Hot Springs Rd, Nakusp, BC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.