Demolition, site work, new construction, remodeling, renovation and addition to a mixed-use development in West Monroe, Louisiana. Completed plans call for site work for a educational facility; and water / sewer project.

Bidders will be required to provide Bid security in the form of a cashier's check, certified check or Bid Bond of a sum no less than Five percent (5%) of the Bid total as a guarantee that, if awarded the Contract, the Bidder will promptly enter into a contract with the Owner and execute such bonds as may be required. The successful Bidder will be required to furnish a performance and payment bond written by a company licensed to do business in Louisiana, and shall be countersigned by a person who is contracted with the surety company or bond issuer as agent of the company or issuer, and who is licensed as an insurance agent in this State, and who is residing in this State, in an amount equal to the 100% of the contract amount in accordance with Article 5 of the General Conditions. In addition, the successful Bidder shall be required to furnish a Labor and Material Payment Bond for the Contract in accordance with Article 5 of the General Conditions. All Contractors bidding on this work shall comply with all provisions of the State Licensing Law for Contractors, LA RS 37:2150-2192, as amended, for all public contracts. It shall be the responsibility of the General or Primary Contractor to assure that all subcontractors comply with this law. Contractors must hold an active license issued by the State of Louisiana Licensing Board for Contractors in the classification of MUNICIPAL AND PUBLIC WORKS CONSTRUCTION. Contractors must provide their license number when requesting plans, specifications and contract documents and place their license number on the face of the envelope containing their bid. A corporate resolution authorizing a representative of the corporation to sign the bid must accompany the bid, if the bidder is a corporation. Such activities will be in accordance with Title 38 of the Louisiana Revised Statues. No bid may be withdrawn for a period of thirty (30) days after receipt of bids, except under the provisions of Act 111 of 1983. The Owner reserves the right to reject any and all bids. No Pre-Bid Conference will be held for this project. Bidders are encouraged to review the Bidding Documents and project Site as soon as practical and to submit any requests for clarification to the ENGINEER. ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in response to questions received. Oral statements may not be relied upon and will not be binding or legally effective. All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. A. The Work will be substantially completed within 120 days after the date when the Contract Times commence to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 135 days after the date when the Contract Times commence to run. A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $300.00 for each day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER $300.00 for each day that expires after the time specified in paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment. Question Deadline 11/19/2024

Post-Bid

Water / Sewer

$200,000.00

Public - County

Addition, Demolition, New Construction, Remodeling, Renovation, Site Work

9

16

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
6
Bidding Soon
106
All Active Projects
54
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

January 2, 2025

img_map_placeholder

Multiple Locations, West Monroe, LA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.