BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2024 at 7:00 PM

Updated August 21, 2025

This is a service / maintenance or supply contract in Whittier, California. Contact the soliciting agency for additional information.

The Districts is seeking proposals from qualified firms for services related to development and calibration of a hydraulic flow model of a portion of its wastewater collection system. This Request for Proposals (RFP) provides background on the need for the hydraulic model, required scope of work, consultant selection process, and minimum information that must be included in a proposal. Question Cut-Off Date: 12/05/2024 Any questions regarding this bid must be directed per the instructions listed within the bid package. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
572
Active Projects
72
Bidding Soon
3,844
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

Project location map

Multiple Locations, Whittier, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.