BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2025 at 8:00 PM

Updated October 28, 2025

Site work and new construction of a civil project in Whittier, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

DESCRIPTION OF WORK: The Heli Hydrant Project consists of construction new water facilities (including a pump house, 22,000-gallon reservoir, and 8,000-gallon helihydrant), pipelines, and various appurtenances, detailed further in the following paragraphs. The work will be performed between two contractors; one contractor to be selected and contracted by the City via this Notice Inviting Bids (NIB), and one contractor to be selected and contracted by the Los Angeles County Fire Department (LACFD). The work to be performed by the City's selected contractor will include the installation of a pump house, 1,000 gallon per minute (GPM) pump & motor (Total Developed Head (TDH) of 216 ft), 8-inch control valve, 8-inch reduced pressure principal assembly, 8-inch flow meter, valves and appurtenances, as well as site grading and pad construction, installation of vaults, 1500 linear feet of 8-inch HDPE piping, 70 of linear feet of 3-inch PVC piping, a block retaining wall, electrical equipment, fuel-tank relocation and appurtenances which will be installed by others in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2021 Edition, and American Water Works Association (AWWA) Standards, in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2021 Edition. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee excavation permit(s) for the project from the City of Whittier, Public Works Department. ALL QUESTIONS OR REQUESTED CLARIFICATIONS SHALL BE MADE IN WRITING VIA EMAIL AT PUBWKS@CITYOFWHITTIER.ORG ON OR BEFORE SEPTEMBER 30, 2025 AT 4:00 PM

Award

Water / Sewer

$1,360,633.00

Public - City

New Construction, Site Work

30

26

10

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
637
Active Projects
273
Bidding Soon
3,310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2025

December 2, 2025

Project location map

13919 Penn St, Whittier, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.