Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 27, 2025 at 8:00 PM
Updated October 28, 2025
Site work and new construction of a civil project in Whittier, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
DESCRIPTION OF WORK: The Heli Hydrant Project consists of construction new water facilities (including a pump house, 22,000-gallon reservoir, and 8,000-gallon helihydrant), pipelines, and various appurtenances, detailed further in the following paragraphs. The work will be performed between two contractors; one contractor to be selected and contracted by the City via this Notice Inviting Bids (NIB), and one contractor to be selected and contracted by the Los Angeles County Fire Department (LACFD). The work to be performed by the City's selected contractor will include the installation of a pump house, 1,000 gallon per minute (GPM) pump & motor (Total Developed Head (TDH) of 216 ft), 8-inch control valve, 8-inch reduced pressure principal assembly, 8-inch flow meter, valves and appurtenances, as well as site grading and pad construction, installation of vaults, 1500 linear feet of 8-inch HDPE piping, 70 of linear feet of 3-inch PVC piping, a block retaining wall, electrical equipment, fuel-tank relocation and appurtenances which will be installed by others in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2021 Edition, and American Water Works Association (AWWA) Standards, in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2021 Edition. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee excavation permit(s) for the project from the City of Whittier, Public Works Department. ALL QUESTIONS OR REQUESTED CLARIFICATIONS SHALL BE MADE IN WRITING VIA EMAIL AT PUBWKS@CITYOFWHITTIER.ORG ON OR BEFORE SEPTEMBER 30, 2025 AT 4:00 PM
Award
Water / Sewer
$1,360,633.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2025
December 2, 2025
13919 Penn St, Whittier, CA
Related To This Project
Whittier, CA
Bid Date: Sep 30 2025
Whittier, CA
Bid Date: Sep 23 2025
Whittier, CA
Bid Date: Oct 22 2025
Whittier, CA
Bid Date: Sep 11 2025
Whittier, CA
--
Whittier, CA
Bid Date: Nov 13 2025
Whittier, CA
Bid Date: Oct 21 2025
Whittier, CA
Bid Date: Nov 13 2025
Whittier, CA
Bid Date: Sep 16 2025
Whittier, CA
Bid Date: Sep 01 2025
Whittier, CA
Bid Date: Sep 12 2025
Whittier, CA
Bid Date: Jul 23 2019
Whittier, CA
Bid Date: Jul 23 2020
Whittier, CA
Bid Date: Mar 16 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
