Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Site work for a civil project in Whittier, California. Completed plans call for site work for a water / sewer project.

The project involves the replacement of the existing chilled water plant, which includes: replacement of three existing chillers, two existing chilled water pumps, and two condenser water pumps; replacement and modification of piping, valves, and supports; installation of a new chiller plant control system; replacement of chiller plant instrumentation; electrical conduits, conductors, panels, and ductbanks; installation of variable frequency controllers; modification of existing switchgear; and replacement of equipment pads. The project also includes modifications to campus chilled water piping, replacement of air handler chilled water control valves, demolition of existing booster pumps, and upgrading the existing Building Automation System (BAS) Each bid and must be accompanied by a certified check, cashier's check, or bid bond with an approved surety company as surety, payable to Los Angeles County Sanitation District No. 2 or other authorized security provided by Public Contract Code 20784, for an amount equal to at least ten percent of the amount bid as a guaranty that the bidder, if successful, will enter into a contract satisfactory to the Board of Directors for completing the work contemplated. The successful bidder must file good and sufficient bonds for the faithful performance of the contract and for the payment of laborers and materialmen. Bonds for the faithful performance of the contract and for the payment of laborers and materialmen that are issued by sureties that are listed in the latest version of the U.S. Department of Treasury Circular 570 and that are authorized to issue bonds in the State of California The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$6,993,444.00

Public - County

Site Work

125

19

7

7

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
0
Bidding Soon
1,821
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

January 12, 2026

Project location map

1955 Workman Mill Rd, Whittier, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.