Published November 11, 2021 at 7:00 PM
Updated October 28, 2025
Site work for a water / sewer project in Whittier, California. Completed plans call for site work for a water / sewer project.
The work to be performed consists of removal and replacement of existing sewer main, manholes, lampholes, and laterals, and appurtenant, in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2018 Edition. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee excavation permit(s) for the project from the City of Whittier, Public Works Department. The Contractor shall commence ordering all necessary materials within ten (10) working days after notification that the contract has been executed and shall be completed within one hundred twenty (120) working days after date set forth in the Notice to Proceed. : Each bid shall be made on the proposal form furnished by the Whittier Utility Authority herewith and shall be in accordance with the plans, specifications and other contract documents and shall be accompanied by a certified check, cashier's check or bidders' bond, payable to Whittier Utility Authority in a sum not less than ten percent (10%) of the amount of the bid, as a guarantee that the bidder will enter into the contract for the work, the full amount of such guarantee to be forfeited to Whittier Utility Authority should said bidder fail to enter into said contract. The successful bidder will be required to furnish a Faithful Performance Bond in the amount of not less than one hundred percent (100%) of the contract price, a Labor and Material Bond in an amount of not less than one hundred percent (100%) of the contract price, said bonds to be secured from a surety company authorized to do business in the State of California, and to be subject to the approval of the City Attorney.
Award
Water / Sewer
$3,016,910.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2021
December 20, 2021
Multiple Locations, Whittier, CA
Related To This Project
Whittier, CA
Bid Date: Jan 08 2026
Whittier, CA
Bid Date: Dec 16 2025
Whittier, CA
Bid Date: Dec 09 2025
Whittier, CA
--
Whittier, CA
Bid Date: Dec 22 2025
Whittier, CA
Bid Date: Dec 18 2025
Whittier, CA
Bid Date: Jan 16 2026
Whittier, CA
Bid Date: Feb 13 2026
Whittier, CA
Bid Date: Dec 04 2025
Whittier, CA
Bid Date: Jan 12 2026
Whittier, CA
Bid Date: Oct 24 2025
Whittier, CA
Bid Date: Oct 22 2025
Whittier, CA
Bid Date: Oct 14 2025
Whittier, CA
Bid Date: Oct 21 2025
Whittier, CA
Bid Date: Nov 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.