BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Site work and paving for a sidewalk / parking lot in Whittier, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

You are invited to review and respond to this Small Business Bid Solicitation (SB Bid) entitled 25-269 - Parking Lot Repair, Seal and Stripe Services at the Whittier DMV Field Office. In submitting your bid, you must comply with the instructions found herein. Purpose and Description of Services: Parking lot repair, seal and stripe services at the Whittier DMV field office. Question Deadline 12/15/2025 at 10:00 AM PT Written responses to be released by 5:00 p.m. on 12/17/2025. Term: Forty-five (45) calendar days within a term of twelve (12) months (see Schedule of Events for proposed start date of contract). See Exhibit A, Scope of Work, for a complete description of services. Bidder Qualifications: The bidder shall possess a valid A or C-12 contractor license issued by the California Department of Consumer Affairs, Contractors State License Board (CSLB). All subcontractors that the bidder intends to utilize to perform work under the contract shall possess all applicable contractor licenses for the work they shall perform under the contract. All bidder and subcontractor contractor licenses shall be in good standing from the time of the bid opening through the term of the contract. (See solicitation for full Bidder Qualifications.) The contact person for this SB Bid is: Allison Stanek Department of Motor Vehicles Phone: (916) 818-2848 Email: allison.stanek@dmv.ca.gov a. The Contractor shall remove 2" (two inches) of asphalt, apply tack coat, and replace 2" (two inches) of asphalt. The Contractor shall verify the approximate total of 90,000 sq. ft. of parking lot and vehicular lanes. Asphalt weight tickets shall be verified with the DMV Project Manager. b. The Contractor shall apply two (2) or more coats of asphalt seal covering on all asphalt surfaces a minimum of thirty (30) days after asphalt installation. c. The Contractor shall install four (4) asphalt speed bumps, two (2) speedbumps to be twenty (20) ft each, two (2) speed bumps to be thirty-five (35) ft each. d. Work includes replacement of forty (40) concrete wheel stops: Realign and predrill new bumpers. e. The Contractor shall stripe entire parking lot after asphalt overlay. The Contractor shall repaint existing painted curbs, arrows and symbols with same original colors and re-stripe per specification all existing spaces and lines with matching original colors or colors to meet Title 24 of the 2016 CBC. f. The Contractor shall stripe entire parking lot again after seal coat is performed

Award

Sidewalks / Parking Lot

$266,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
0
Bidding Soon
1,839
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2025

February 1, 2026

Project location map

9338 Painter Ave, Whittier, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.