Renovation of a water / sewer project in Saint Louis, Missouri. Working plans call for the renovation of a water / sewer project.

As of January 13, 2025, this project is a request for information. Missouri River Wastewater Treatment Plant Facility Renewable Natural Gas Generation. The MO River WWTF is located at 3455 Creve Coeur Mill Road in St. Louis, MO. The biogas is produced from on-site anaerobic digestion. MSD will supply raw and unscrubbed biogas to a custody transfer point for the Responder to upgrade it to renewable natural gas ("RNG") and sell for its physical and environmental attributes. RSOI Questions Questions must be submitted via email to both the following Project Managers. Questions received after 4:00 pm local time December 2, 2024 may not be answered. Interpretations or clarifications considered necessary by the Project Manager in response to such questions will be issued by Addenda to all Entities. Oral or other interpretations or clarifications shall be without legal effect, even if made during formal meetings. Micki Hansel, PE Project Manager III CDM Smith Inc 816-412-3133 hanselms@cdmsmith.com 1980s and is currently rated for a design flow of 38 million gallons per day (MGD) of primary and secondary treatment. Wastewater solids are stabilized in an anaerobic digestion process that produces biogas, which is currently utilized onsite The MO River WWTF uses anaerobic digestion for stabilizing primary sludge and thickened waste activated sludge. The digestion facility consists of five digesters: Digesters No. 1 through No. 4 are 70 ft in diameter with a tank volume of 0.9 million gallons each, and Digester No. 5 is 96 ft in diameter with a volume of 1.66 million gallons. Digester No. 4 operates as a secondary digester while the rest function as primary digesters. Typically, only three primary digesters are operated under most conditions. Digested sludge is transferred to the secondary digester and then dewatered and disposed of at a landfill. Question Deadline 12/02/2024 at 4:00 PM CT Questions must be submitted via email to both the following Project Managers. . Interpretations or clarifications considered necessary by the Project Manager in response to such questions will be issued by Addenda to all Entities. Oral or other interpretations or clarifications shall be without legal effect, even if made during formal meetings. Micki Hansel, PE Kevin Koines Project Manager III Senior Civil Engineer - Design CDM Smith Inc Metropolitan St. Louis Sewer District 816-412-3133 314-768-6301 hanselms@cdmsmith.com

Final Planning

Water / Sewer

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
119
Bidding Soon
1,233
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

July 13, 2025

Project location map

3455 Creve Coeur Mill Rd, Saint Louis, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.