BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2025 at 7:00 PM

Updated February 4, 2025

Site work and new construction of a pre-engineered storage facility in Warren, Ohio. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Engineers Estimate of Probable Cost o Base Bid $500,000.00 (1) a Bond, for the Full Amount of His Bid; or (2) a Certified Check Equal to Ten Percent (10%) of His Bid; or (3) a Cashier's Check Equal to Ten Percent (10%) of His Bid; or (4) a Letter of Credit, Under Chapter 1305 of the Ohio Revised Code, Equal to Ten Percent (10%) of His Bid. Any Bid Guaranty Shall Be Subject to the Applicable Provisions of Chapter 153 of the Ohio Revised Code to the Same Extent as if Said Provisions of Chapter 153 Were Fully Incorporated Within Said Bid Guaranty. If the Bid is Accepted, the Successful Bidder Shall Enter Into a Contract and Furnish a Contract Performance Bond as Provided Below: (a) a Contract Performance Bond in an Amount to 100% of the Estimated Cost of the Work, Conditioned Among Other Things, That the Contractor Will Perform the Work Upon the Terms Proposed, Within the Time Prescribed, in Accordance With the Plans and Specifications. (B) a Payment Bond in an Amount Equal to 100% of the Estimated Cost of the Work Condition for the Payment by the Contractor and All Subcontractors for Labor Performed and Materials Furnished in Connection With the Project Involved. No Bids May Be Withdrawn After the Scheduled Closing Time for Receipt of Bids for at Least Ninety (90) Days. The Board of Control Reserves the Right to Reject Any or All Bids and to Waive Any Informalities in Bidding. Question Deadline 11/21/2024 If any person who contemplates the submission of a proposal is in doubt as to the true meaning of any part of plans, specifications, or other proposed contract documents, he may submit to the City, at least ten (10) days prior to the date set for the receiving of proposals, a written request for an interpretation thereof Please note: Contractor, subcontractors and suppliers are responsible for all information on the contract documents regardless if only partial sets are downloaded. It is the General Contractor’s responsibility to supply their subs and suppliers any addendums or project updates. General Contractors not registered with the Architect’s office cannot receive addendums or linked sharefiles to supply to their subs and suppliers.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$479,700.00

Public - City

New Construction, Site Work

20

7

4

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
311
Active Projects
142
Bidding Soon
1,665
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 6, 2025

Project location map

521 Main Ave SW, Warren, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.