BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Site work for a playground / park / athletic field in Kailua Kona, Hawaii. Completed plans call for site work for a playground / park / athletic field.

**As of April 11, 2025 this project has not yet been awarded. A timeline for the award has not yet been established.** HOST Park Fence Replacement Description The services to be performed are for replacement of various sections of chain link fence in and around NELHA's HOST Park located at 73-970 Makako Bay Drive, Kailua-Kona, Hawaii 96740 (Refer to Exhibit E1). More precisely, the services shall include (1) Removal and proper disposal of specified deteriorated fencing, and (2) Installation of approximately 3,330-ft of new replacement fencing. The project is divided into six (6) work packages or line items within this solicitation requiring the contractor to bid on each one separately. The Contractor shall provide all labor, tools, equipment, and materials to perform all work related to removal of specified old fence and construction of new fence. No existing materials shall be utilized to construct the new fence except where noted in Section 1.2: Materials & Constructions Practices. Materials & Construction Practices All materials and construction practices referred to in "2005 Standard Specifications" (Hawaii State Department of Transportation) shall apply. For reference purposes, this document can be found at: https://hidot.hawaii.gov/highways/s2005-standard-specifications/2005-standard-specifications Relevant Sections of 2005 Standard Specificationsinclude: o Section 105 - Control of Work o Section 202 - Removal of Structures and Obstructions o Section 601 - Structural Concrete o Section 607 - Chain Link Fences and Gates o Section 701 - Hydraulic Cement o Section 703 - Aggregates o Section 712 - Miscellaneous o Section 722 - Chain Link Fence Materials State reserves its right to deny a substitution; and if a substitution is denied, the contractor is not entitled to additional compensation or time extension."

Bid Results

Playgrounds / Parks / Athletic Fields

$522,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
9
Bidding Soon
76
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2025

March 10, 2025

Project location map

73-970 Makako Bay Dr, Kailua Kona, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.