BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2025 at 7:00 PM

Updated January 10, 2025

Site work and paving for a mixed-use development in Hollister, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reference Number : 0000367801 The exact engineer's estimate cannot be released prior to the bid opening. The range varies from $7,000,000 to $7,500,000. The IWTP portion of this project involves the construction of a new Trash Capture Structure, inlet structure, outlet structure, emergency spillway, improvements to the existing Pond 1 pump station to include a new emergency backup generator, new slide gate diversion structure and inlet structure to Pond 3, and hardened spillways for Ponds 3, 4 and 5. The Bridge Road portion of this project involves the construction of three (3) new trash capture structures, two (2) flow diversion structures, one (1) flow splitter structure, inlet/outlet pipes, manholes, reconstruction of existing city parking lot, relocation of an existing city water line, and site solar lighting. Question Deadline 12/31/2024 at 5:00 PM PT, Questions must be received prior to this time and date via online All questions received after this date and time will not be answered. General Requirements - Certified Payroll - Contractors License Required - Insurance Required - Prevailing Wage Required - Bid Bond 10 % All proposals or bids shall be accompanied by cash, cashier's or certified check payable to the order of the City Council of the City of Hollister, amounting to ten percent (10%) of the bid, or by a bond in said amount and payable to said Clerk signed by the bidder and a corporate surety, or by the bidder and two sureties who shall justify before any officer competent to administer an oath, in double said amount and over and above all statutory exemptions. The amount so posted shall be forfeited to said City in case the bidder depositing the same does not, within ten (10) days after written notice that the contract has been awarded to him, enter into a contract with the City. All certified or cashier's checks will be deposited pending award of contract. Return of deposited certified or cashier's checks will take approximately 30 days from award of contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Sidewalks / Parking Lot

$8,441,982.00

Public - City

Paving, Site Work

70

23

25

11

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
146
Bidding Soon
1,972
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2025

February 7, 2025

Project location map

Bridge Rd, Hollister, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.