Published December 20, 2024 at 7:00 PM
Updated December 21, 2024
Site work for a power facility in Cherry Point, North Carolina. Completed plans call for site work for a power facility.
This procurement is restricted to the Mechanical MACC contractors. Only the Mechanical MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings. GENERAL REQUIREMENTS Project No.: 7440812(Clauses incorporated in Base Contract apply to this solicitation) Title: Repair Voltage Regulator, Substation #2 NAICS Code and Standard Size: 238220, Plumbing, Heating, and Air-Conditioning Contractors, 19 Million Contract Completion Date: All work shall be completed within 180 calendar days after award Estimated Cost Range: Between $250,000.00 and $500,000.00 Wage Determination: General Decision NC20240018 01/05/2024 Liquidated Damages: $192 per calendar day of delay Basis for Award: Lowest Price Proposal Acceptance Period: 90 calendar days after receipt of offers Site Visit: 19 November 2024 @ 0830 Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project. Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. An electronic copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. Bonds to Be Provided Electronically, Seals Must Be Visible o No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only. o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. Requests for Information (RFIs): RFIs must be submitted email addresses above. The cut off for RFIs is 30 November 2024 by 0900 in order to process all inquiries by the proposal due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Power Plant
$500,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2024
January 20, 2025
To Be Determined, Cherry Point, NC
Related To This Project
Cherry Point, NC
Bid Date: Dec 11 2024
Cherry Point, NC
Bid Date: Dec 17 2024
Cherry Point, NC
Bid Date: Jan 08 2025
Cherry Point, NC
Bid Date: Dec 12 2024
Cherry Point, NC
Bid Date: Dec 11 2024
Cherry Point, NC
Bid Date: Dec 17 2024
Cherry Point, NC
Bid Date: Dec 12 2024
Cherry Point, NC
Bid Date: Jan 16 2025
Cherry Point, NC
Bid Date: Nov 06 2024
Cherry Point, NC
Bid Date: Nov 07 2024
Cherry Point, NC
Bid Date: Aug 28 2024
Cherry Point, NC
Bid Date: Aug 21 2024
Cherry Point, NC
Bid Date: Aug 14 2024
Cherry Point, NC
Bid Date: Aug 20 2024
Cherry Point, NC
Bid Date: Aug 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.