BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Sylvester, Georgia. Completed plans call for the construction of a 30,253-square-foot detention facility; for site work for a detention facility; and water / sewer project.

Construction of a new 30,253 SF jail with a capacity of 118 beds, expanding to 144 beds in the future. The structure will consist of a combination of concrete, pre-cast concrete, masonry, and pre-engineered steel. The envelope of the building will consist primarily of a mixture of metal panels, TPO roofing, and face brick. Site work, site utilities, and site improvements are a part of the project. Location: Sylvester, GA. The project site is bordered by South Washington Street to the west, West Martin Luther King Drive to the north, South Isabella Street to the east, and West Crockett Street to the south. All questions MUST be submitted in writing to Wilkes Evans (wevans@allstateconstruction.com) via email. Questions over the phone will not be accepted to maintain the integrity of the process and ensure each bidder is being provided with the same information for the development of their proposals. All questions must be submitted by December 2, 2024, at 11:00AM local time. The project is scheduled to start approximately late February or early March of 2025, pending final receipt of trade contractor proposals, development of the Guaranteed Maximum Price (GMP) proposals, approval of the GMP by the Owner, and finalization of all other requirements of the Owner to facilitate the start of construction. A construction schedule is included in the documents section at the link below. The Owner and Construction Manager reserve the right to reject any proposals not conforming to the requirements set forth within the documents. Final notice of the lowest responsive bidder will take place once all the proposals are reviewed by the Owner and Construction Manager for conformity. Future addenda will be distributed through the BuildingConnected project link above. Acknowledgment of all addenda will be required on the bid form for each package. Issuance of any addenda will follow the guidelines for timing set for by the State of Georgia.

Sub-Bidding

Jails / Prisons

$6,080,853.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
8
Bidding Soon
285
All Active Projects
158
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

January 13, 2025

img_map_placeholder

201 N Main St, Sylvester, GA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.