Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Site work for a playground / park / athletic field in Sylvester, Georgia. Completed plans call for site work for a playground / park / athletic field.
Hitting Facility Construction for Worth County Schools Softball/Baseball Complex. Foundation Furnish and install 122 ft x 66 ft concrete foundation 4-inch-thick concrete slab, reinforce per industry standards and project requirements 2. Metal Building Construction Erect a fully insulated pre-engineered metal building with dimensions: 110 ft length x 50 ft width x 15 ft eave height Install 3-inch vinyl-backed insulation throughout the building interior Walls to consist of 26-gauage PBR metal panels 16-inch soft overhang on all sides including gutters and downspouts 3. Doors and Openings (4) 10ft x 10ft roll-up doors (1) double walk-through exterior door (1) single-walk through exterior door All doors and locks to be procured through Valdosta Commercial Doors and Lock, per owner specification 4. Additional Provisions Compliance with local, state, and federal building codes Site cleanup and removal of all construction debris Coordination with project representatives and inspectors
Award
Playgrounds / Parks / Athletic Fields
$248,360.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 11, 2025
September 11, 2025
1906 GA-313, Sylvester, GA
Related To This Project
Sylvester, GA
Bid Date: Jul 24 2025
Sylvester, GA
Bid Date: Aug 28 2025
Sylvester, GA
Bid Date: Nov 13 2025
Sylvester, GA
Bid Date: Aug 28 2025
Sylvester, GA
Bid Date: Oct 30 2025
Sylvester, GA
Bid Date: Nov 12 2025
Sylvester, GA
Bid Date: Feb 26 2026
Sylvester, GA
Bid Date: Apr 01 2021
Sylvester, GA
Bid Date: May 12 2025
Sylvester, GA
--
Sylvester, GA
Bid Date: Mar 03 2025
Sylvester, GA
--
Sylvester, GA
Bid Date: Jan 06 2025
Sylvester, GA
Bid Date: Dec 05 2024
Sylvester, GA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
