BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 31, 2025 at 7:00 PM

Updated February 20, 2025

Site work and paving for a mixed-use development in South Bend, Indiana. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; road / highway; and road / highway.

The Project consists of the bridge superstructure replacement and rehabilitation of Bridge No. 196, Mayflower Road over Ardmore Trail, including but not limited to replacing the existing superstructure with continuous composite prestressed concrete box beams, removing the existing end bent caps and reconstructing them as semi-integral end bents, substructure patching, removing and reconstructing the top of the interior bent caps to accommodate the new superstructure, repairing erosion at the top of the concrete slope walls with flowable backfill, replacing the reinforced concrete bridge approach slabs (RCBAs), terminal joints, and sleeper slabs, removing the existing guardrail along both Mayflower Road and Ardmore Trail and replacing it with new MGS W-beam guardrail, and providing maintenance of traffic. The bidder awarded the contract will be required to furnish separate Payment, Performance, and Maintenance Bonds before commencing work. The Payment and Performance Bond shall each remain in effect throughout the entire construction period in an amount equal to the awarded Contract Amount. The required Maintenance Bond shall remain in effect for a period of up to five years from the date of final acceptance in an amount of 10 percent [10%] of the awarded Contract Amount. The bidder's attention is directed to the Affirmative Action Requirements, the Prevailing Scale of Wages and the Insurance Provisions of the Project. THE Board of Commissioners reserves the right to reject any or all bids or to accept the one which, in its judgment will be to the best interest of St. Joseph County, Indiana. The Board of Commissioners also reserves the right to hold Bids up to 60 calendar days. from the receipt of the Bid.

Award

Bridges / Tunnels

$2,383,133.00

Public - County

Paving, Site Work

55

5

7

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
97
Bidding Soon
1,860
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

March 1, 2025

Project location map

Ardmore Trail, South Bend, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.