BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Renovation of an educational facility in Edmonton, Alberta. Completed plans call for the renovation of a educational facility.

NAIT's W Building is only separate to Y Building (Spartan Centre) by name, they share common utility meters and a common heating plant. The existing heating and cooling systems have reached the end of their service life, necessitating replacement to enhance energy efficiency, reliability, and operational performance. The scope of this project includes replacing the hot water boilers, domestic water heaters, cooling tower, dry cooler, condenser water piping, filtration system, steam boiler, and 24 Variable Frequency Drives (VFDs). Project Scope The goal of this project is to upgrade the mechanical system serving the W and Y Building. Expected scope of work includes, but not limited to: 1. Cooling System Upgrades: a. Replacement of the existing cooling tower with a high-efficiency model featuring a direct-drive fan for improved energy efficiency and reduced maintenance. b. Installation of a new filtration system to replace the existing side-stream separator with a basin sweeping filtration system, which will minimize sediment buildup, reduce maintenance, and enhance system longevity. c. Replacement and relocation of the dry cooler to an unobstructed rooftop location to improve airflow and cooling performance. d. Replacement of corroded carbon steel condenser water piping with Schedule 80 PVC to mitigate corrosion issues and reduce maintenance requirements. 2. Heating System Upgrades: a. Installation of four high efficiency condensing boilers to improve system redundancy and accommodate future expansion needs. b. Modification of the piping in the mechanical room to account for the new boilers. c. Replacement of domestic water heaters with high efficiency condensing models to optimize energy performance. d. Steam boiler replacement and associated parts for humidification system. 3. VFD Replacements: a. Replacement of the existing VFDs which have reached the end of their service life. Documents can be obtained from https://nait.bonfirehub.ca/opportunities/94022 Proponent Questions as of June 13, 2025

Award

Educational

$3,170,761.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
26
Bidding Soon
549
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

August 1, 2025

Project location map

10504 Princess Elizabeth Ave NW, Edmonton, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.