BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2025 at 8:00 PM

Updated June 26, 2025

Demolition, site work and new construction of a warehouse / distribution facility in Los Angeles, California. Completed plans call for the demolition of a warehouse / distribution facility; for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

**As of June 25, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Waterfront & Commercial Real Estate Division of the City of Los Angeles Harbor Department is soliciting Statements of Interest for the adaptive reuse of the existing Los Angeles Municipal Warehouse No. 1 for commercial and/or visitor-serving use. Questions Due: Wednesday, January 15, 2025 by 3pm, Harbor Department Response to Questions February 7 2025, SOI/RFI Responses Due March 10, 2025 Community engagement Approx. 2Q 2025 RFQ Phase Approx. 3Q 2025 RFP Phase Approx. 4Q 2025 - 1Q 2026 For questions regarding the scope or administrative nature of the RFI, please contact the Harbor Department by email at THerr@portla.org. Questions must be submitted by January 15, 2025, and will be answered in writing and posted online Located in the Outer Harbor area at the southern end of the Main shipping channel, Warehouse No. 1 is one of the largest and most prominent structures at the Port of Los Angeles. The reinforced board-formed concrete structure is 6 stories tall (68 feet high) with 480,000 sf of interior space. A building footprint of 500 x 160 feet (80,000 sf) sits on an overall site consisting of approximately 125,000 sf, or approximately 2.9 acres. Both massive in size and detailed in design, the Neoclassical building features lions-head gargoyle down spouts and an iconic water-tower atop the building that makes it instantly recognizable to millions. The ground floor was designed to accommodate 24 internal freight cars for quick movement of shipments to the wharves. The first floor is 14'-6" in height and the remaining floors have 10'-0" floor to ceiling heights. A basement roughly 5 feet below grade has a 7'-9" floor to ceiling height. Principal access is located on the north end of the building and includes a concrete ramp and loading docks on either side of the ramp. The site is paved and includes 50 parking spaces located on its north, east and west sides.

Post-Bid

Warehouse / Distribution

$51,840,000.00

Public - City

Demolition, New Construction, Site Work

4

15

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
20
Bidding Soon
2,452
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

November 5, 2025

Project location map

N Palos Verdes St, Los Angeles, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.