BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2024 at 7:00 PM

Updated December 20, 2024

Site work for a civil project in La Glace, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

Bridge Culvert Liner Installation, Install Smooth Wall Steel Pipe Culvert and Other Work HWY 59:02 BF8519 - Carrying Highway 59 Over Niobe Creek kilometre 44.387 to 44.387 PEACE REGION APPROXIMATE QUANTITIES: 1 Lump Sum Excavation - Structural 47 Metres SWSP (3050mm O.D. x 12.7mm thickness) - Supply 47 Metres SWSP (3050mm O.D. x 12.7mm thickness) - Install 47 Metres Culvert Liner - Supply and Install (S.W.S.P.) (2400 mm dia.) Contractor to supply all materials.

Award

Bridges / Tunnels

$1,808,799.00

Public - State/Provincial

Site Work

13

8

4

6

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

January 6, 2025

Project location map

AB-59, La Glace, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.