Published May 15, 2025 at 8:00 PM
Updated May 16, 2025
Site work and paving for a mixed-use development in East Grand Forks, Minnesota. Design plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of May 15, 2025, per owner, design team has been identified. Project is not being constructed at this time. Plan Development phase 1 winter 2025-Spring 2026. Construction Phase 1 expected Spring 2026-Winter 2027. Purpose The City of Grand Forks is requesting proposals from qualified firms to provide design and construction services for phase I of the downtown gateway and greenway project. Background The project area is located in the Greenway downtown area, located on the South side of Demers Avenue near the Red River at approximately 109 Demers Avenue. The Greenway was constructed as part of the flood protection system built over 20 years ago. In 2022, the City hired an architect to develop a master plan to be used for future consideration for design and construction. The master plan included input from surveys sent to the public, public input meetings and collaboration with the steering committee. Included at the end of this RFQ, is the Phase I Master Plan design. After the master plan was completed, the City worked closely with the North Dakota Parks and Recreation team and was successful in receiving a grant from the Outdoor Recreation Legacy Partnership (ORLP) Program for phase I of this project. The proposed Downtown Gateway and Greenway project plan consists of developing a user-friendly outdoor space for a multi-generational audience. Phase I of the project will create ADA Access for connecting trails throughout the park. There will be a monument that identifies the public park and serves as a place for the public to gather. The nature promenade will be built as a calming space for the public to reconnect with the river and nature. A park shelter will be built to host public gatherings. Finally, the play area will consist of outdoor recreation activities to include slides, bouldering, and ropes area. Scope of Services The following is a summary of the major elements that will be included in the scope of services (but not limited to): o Project, Budget, Schedule and Client Management o Design, Planning and Project Specifications Development o Coordination with a variety of agencies: U.S. Army Corps of Engineers, State Historical Preservation Society, and others as needed o Construction, Permitting and Bidding Documents Production o City Council Meetings Attendance as Required o Construction Observation and Administration o Project Closeout Project Timeline The following schedule for phase I aligns with the OLRP grant schedule. o Phase I Plan Design - January 2025 through December 2025 o Coordination with USACE and Environmental Documentation - Winter 2025 through Fall 2025 o Phase I Construction - Spring 2026 through Winter 2027 o Open to public in 2027
Design
Playgrounds / Parks / Athletic Fields
$6,979,500.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2026
109 Demers Ave, East Grand Forks, MN
Related To This Project
East Grand Forks, MN
Bid Date: Jan 02 2025
East Grand Forks, MN
Bid Date: Mar 09 2025
East Grand Forks, MN
Bid Date: Apr 15 2025
East Grand Forks, MN
Bid Date: Apr 24 2025
East Grand Forks, MN
Bid Date: Jul 31 2025
East Grand Forks, MN
Bid Date: Nov 18 2025
East Grand Forks, MN
Bid Date: Nov 13 2025
East Grand Forks, MN
Bid Date: Sep 10 2024
East Grand Forks, MN
--
East Grand Forks, MN
--
East Grand Forks, MN
--
East Grand Forks, MN
--
East Grand Forks, MN
--
East Grand Forks, MN
Bid Date: Apr 18 2024
East Grand Forks, MN
Bid Date: Apr 11 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.