BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2024 at 7:00 PM

Updated November 22, 2024

This is a service / maintenance or supply contract in Holmen, Wisconsin. Contact the soliciting agency for additional information.

The following information supplements that provided during the Request for Statement of Qualifications phase: The work in this project includes the replacement of existing campus direct buried steam and condensate distribution systems from vault E-8 to Q-8, which includes site demolition, asbestos abatement, and site restoration. The project schedule/duration information was provided in the Request for Statement of Qualifications and has changed as follows: Substantial Completion: 10/15/2025. Liquidated Damages of Five Hundred Dollars ($500) per calendar day shall be assessed if the Contractor fails to achieve Substantial Completion or causes delay to the Substantial Completion of any portion of the work within the Contract Time Provide a copy of a Bid Bond made out in the penalsum of ten percent (10%) of the Total Bid Amount. In lieu of a Bid Bond, a Certified Check in the amount of ten percent (10%) of the Total Bid Amount is acceptable. A Bid Bond is only required for any Total Bid Amount over $50,000.00. A Total Bid Amount of $50,000.00 or less does not require a Bid Bond. The Set-Aside Requirement for this Project is that (1) not less than thirty percent (30%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Small Business Enterprises" ("SBEs") and (2) not less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Minority Business Enterprises" ("MBEs") (the 10% set aside for MBEs may be included in the 30% set aside for SBEs). If the Contractor is an S/MBE, then any self-performed work may be included in the Set-Aside Requirement. The Contractor is responsible for ensuring that they, and the S/MBEs they have selected, are eligible Connecticut-certified S/MBE contractors. Question Deadline 11/21/2024 at 2:00 PM CT All Requests for Information ("RFI") questions are to be posted under the Q&A Board Tab ONLINE sourcing event for this Solicitation. No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted.

Post-Bid

Educational

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
57
Bidding Soon
510
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

December 23, 2024

Project location map

Multiple Locations, Holmen, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.