BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2026 at 7:00 PM

Updated February 11, 2026

Demolition, site work, paving, outdoor lighting and new construction of a fire / police facility in Iowa City, Iowa. Conceptual plans call for the demolition of a fire / police facility; for the construction of a 10,000-square-foot, two-space fire / police facility; and for site work for a fire / police facility.

The project is to construct a new Fire Station #5 and construction a new replacement Fire Station #3. As we prepare for the construction of fire department facilities the following provides for the most current costing of fire station s that have been built in various areas of the state. The OPN facility study used $466/sf in hard costs and $723/sf as an all-in budget number that include soft costs. These numbers vary greatly and are so doubt subject to many factors such as inflation, land cost, utility fees, and so on. Recent fire station construction hard costs have varied between $500/sf to $575/sf. It is my recommendation that if a replacement fire station or a new location satellite fire station to be constructed that it be no larger than 10,000/sf. A building of this size would allow two apparatus bays that are large enough for primary fire engine, a reserve fire engine, and two smaller units such as a quick response unit and or ambulance. This project is included in the City's 2026-2029 Capital Improvement Program (CIP). As of February 10, 2026, the project is on indefinite hold. Information regarding design firm, construction manager, and general contractor has not been released. Further details regarding construction and completion timelines have not been identified. Funding has not been allocated. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Fire / Police

$15,000,000.00

Public - City

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

Multiple Locations, Iowa City, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.