BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a clubhouse / community center in Great Falls, South Carolina. Completed plans call for the construction of a 4,816-square-foot, two-story above grade clubhouse / community center; and for site work for a clubhouse / community center.

Question shall be submitted in writing to both Alliance and LS3P by November 26th @ 5:00 pm Listed on the national register of historic places, and constructed in the early 1900s, the historic building will be revitalized to become the new visitor center for the Town of Great Falls. The intent is to repurpose the building while preserving and utilize the existing historic structure. On the first floor the building will include an event space, restrooms, stairs to upper level and an elevator. The second floor will consist of an exhibit space for visitors, private office spaces, meeting room, storage rooms, and warming kitchen. The total gross square footage of the building is 9,315 square feet. new wood stud walls to create new spaces, new windows, revised storefront entrances on the South and East walls, a new poured concrete porch and ADA compliant ramp to service the South entrance, elevator, revised code compliant stairs, new sprinkler fire suppression system throughout and a new shingle roof. Type of Contract: Project will be constructed under a single prime contract. Project Location: 651 Dearborn St. Great Falls, South Carolina 29056 1st floor of bldg will include an event space, restrooms, stairs to upper level and an elevator, 2nd floor will consist of an exhibit space, private office space, meeting room, storage rooms, and warming kitchen. total gross SF of the building is 9,315-SF. new wood stud walls to create new spaces, windows, revised storefront entrances, poured concrete porch and ADA compliant ramp, Elevator, revised code compliant stairs, new sprinkler fire suppression system a new shingle roof. last day for questions 11/26/24 5pm

GC Bidding

Clubhouse / Community Centers

$1,000,000.00

Public - City

New Construction, Site Work

46

7

10

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
78
Bidding Soon
1,046
All Active Projects
498
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

February 10, 2025

img_map_placeholder

651 Dearborn St, Great Falls, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.