Demolition, site work and renovation of a transportation facility in Sanford, Florida. Completed plans call for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

Amtrak is accepting Letters of Interest for Construction Services in support of the Sanford Compressor Project in Sanford, FL. The purpose of this Scope of Work is to obtain the demolition of the existing air compressors and air dryers and the installation of new air compressors and air dryers at Amtrak's Sanford Yard Maintenance Facility Description: WORK COVERED BY CONTRACT DOCUMENTS PHASE 1: Demolition and installation of temporary compressors PHASE 2: Installation PHASE 3: Startup and commissioning Minimum Requirements: Min. 5 years' experience with similar work Phase 1- Amtrak is proposing to demolish/remove the existing compressor and air dryer, along with the associated piping and electrical conduit and wiring. A temporary diesel operated compressor shall be provided during the removal installation period so the compressed air supply to the buildings and the service equipment is not interrupted. The temporary units shall have the same capacity and pressure as the existing compressors. **Note: Amtrak forces will do concrete pad work once existing compressor and air dryer is demolished/removed. Contractor will return to complete installation of new compressor and air dryer. Proposed Demolition Work (Phase 1): Perform necessary field surveys and assessments of the site/location. Identify limitations for the removal of existing equipment. Remove existing compressor and associate dryer. Remove electrical wiring to the disconnect. Inspect the existing concrete. (Amtrak forces will repair/replace concrete pad) Remove piping from compressor to flanged valve. Remove inlet and outlet piping from dryer to flanged valves. Support compressor exhaust duct during compressor removal. Connect the temporary diesel operated compressor to the compressed air piping supplying the air receiving tank and connect the outlet of tank to building and services. A centrifugal separator with an auto-drain to be installed at the inlet of the air tank. Separator to be sized for the compressor CFM rating and pressure. The drain to be piped to the outdoors. An automatic drain valve 1/2 " (15 gpm min drain rating) to be installed at the air receiving tank drain. The valve shall be wired for 110V and set to operate every hour for 15 seconds. A low point drain valve to be installed. Valve will be operated to remove manually any moisture accumulated. Removal of any fencing to access the equipment. PHASE 2: INSTALLATION OF NEW EQUIPMENT Install compressor at the proper location. Level and anchor on the concrete pad, 1/2 " SS Anchors Install system controller panels. Install the new dryers. Level and anchor 1/2 " SS Anchors Install new piping to existing isolation valve to compressor. Install braded stainless steel flex connector at each compressor. Compressor outlet piping shall be installed on top of the pipe header (gooseneck) to prevent moisture carry over. See representative P&ID Install new piping from the existing inlet and outlet valves to dryer. Piping material carbon steel or copper K-brazed. Size diameter same or larger to the existing. Provide oil water separator rated for the compressor drain, air receiving tank and centrifugal Air water separator. Provide a duct transition from the new compressor exhaust to the existing duct. A flex connection at the compressor outlet is required. Duct transition, same material, and thickness with the existing duct. Inspect existing duct work for debris and clean duct accordingly. Provide drain piping, 1" diameter, from each compressor, air receiving tank and centrifugal separator to the oil water separator. Pipe the oil water separator to the outdoors. Check each existing air receiving tank's pressure rating. The minimum rating shall be 200 PSI. Tanks shall be ASME stamped for at least 200 PSI if not they shall be replaced with the same CFM capacity and a minimum 250 PSI rating. Install a 185 PSI pressure relief valve on each tank. The piping at the outlet of the PRV shall be same size as the inlet and length no more than 1'-0" from the floor. Install conduit and wiring from a disconnect switch to the new compressor and dryer. Wiring for 460/3/60. The contractor shall survey the existing electrical disconnects, the electrical power feeds, and breakers. If they do not comply with NEC for the power equipment power loads, they shall be upgraded. Install all the required electrical wiring, breakers, and disconnects for the proper operation of the new equipment. Install all the required controls for the controllers and monitors as per the manufacturer's recommendations. Rigid galvanized conduit shall be used. All electrical work as per NEC by a licensed electrician in the state of FL. Test the operation of the electric room heater. Replace as needed. If a heater is not present in the room install an 1800 W forced air heater 208V. Heater to be support with galvanized Unistrut and hardware from ceiling. All walls and roof penetration shall seal with the same material and vapor barrier. Contractor shall provide updated wiring and piping diagrams. Arrange equipment so controls and devices are accessible for servicing. Maintain manufacturer's recommended clearances for service and maintenance. Install the following devices on compressed-air equipment: o Thermometer and Pressure Gages. o Pressure Regulators: Install downstream from air compressors and dryers. o Automatic Drain Valves: Install on receiver tanks, inline filters, air dryers and where indicated on the reference P&ID drawing. Provide 3 hard copies of operating/maintenance manuals and drawings to Amtrak representative and an electronic copy to the Amtrak Project Manager. All the work to be completed according to the national and local building codes. Replace any fence removed during the construction. Clean up and removal of replaced equipment. Phase 3 - Start UP AND COMMISSIONING Startup services and commissioning for all the new equipment. A commissioning protocol shall be developed for each location and shall be reviewed and approved bit the Amtrak Engineer. The commissioning shall be witnessed by Amtrak's representative and signed by Amtrak's Engineer. Engage a factory-authorized service representative to train owner's maintenance personnel to adjust, operate, and maintain air compressors associated equipment and controls during start up. Provide training (8 Hours min) to Amtrak maintenance personnel for the operation and troubleshooting of the equipment.

Post-Bid

Transportation Terminals

$20,000.00

Public - Federal

Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
72
Bidding Soon
1,237
All Active Projects
526
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2024

December 16, 2024

img_map_placeholder

600 S Persimmon Ave, Sanford, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.