BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a mixed-use development in Saint Louis, Missouri. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and road / highway.

Proposed improvements will include signal upgrades and/or enhancements, fiber optic interconnect, traffic monitoring cameras, signal timing and optimization, system integration with the Citys Real-Time Transportation Intelligence Center (TIC), and sidewalk improvements as needed for ADA compliance. The project will be generally located along the South Broadway corridor, from Carroll Street to Marceau Street, a distance of approximately 6.10 miles. Additional improvements outside of the South Broadway corridor may be necessary to provide connectivity to the TIC and redundancy to the Citys fiber optic network. The City will require professional engineering services for both preliminary engineering and construction engineering; including, but not limited to, surveying and data collection; the preparation of right-of-way plans, the preparation of construction documents (plans, technical specifications, and construction cost estimates); attendance at various meetings and presentations, assist and provide supporting documentation for the Citys coordination with affected utilities; shop drawing review; consultant services for construction engineering (if needed); and post construction traffic reporting. Goal of 10% DBE participation for this consultant contract Question Deadline -12/06/2024, All questions shall be directed to Helen Bryant, Contract Supervisor Board of Public Service, by e-mail at bryanth@stlouis-mo.gov, . Questions must be received no later than the close of business five (5) business days before SOQs are due. Questions received after that date will not be answered. BPS reserves the right to reject the proposal of any respondent violating such prohibitions The method of Contractor Selection has not been Determined at this time. MODOT - RFQ Engineering - Traffic Management Enhancements Phase 7: South Broadway ITS (Marceau to Carroll)

Conceptual

Roads / Highways

$10,500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
52
Bidding Soon
794
All Active Projects
293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2025

img_map_placeholder

S Broadway, Saint Louis, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.