BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2024 at 7:00 PM

Updated December 31, 2024

Site work for a water / sewer project in Brimfield, Massachusetts. Completed plans call for site work for a water / sewer project.

Project Public Water Supply Construction. The work includes providing and placing water & electrical lines,construct shed and install water system components, 5,000 gallon underground atmospheric drinking water storage tank, and includes all incidental work. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. This project is ARPA funded therefore, compliance with 2 CFR Part 200: Appendix II, Contract Provisions are required. The work shall include all incidental work including, but not necessarily limited to: traffic management to maintain access to the Town Hall Buildings and Brimfield Housing Authority access. Providing temporary signage, pavement cutting and excavation, tree removal, and site grading associated with construction of a water pump station adjacent to the Town Hall and Town Hall Annex Building on Main Street in Brimfield, MA. Water lines and electrical from the newly constructed well to the water shed. Water lines will be run to the Town Hall and Town Hall Annex Building. The installation of water system equipment including controls, booster pumps, meters, pressure gauges, sample taps, heater and dehumidifier. A single 5,000 gallon storage tank to be installed underground at the area to be designated and connected to the water system in the water shed. Controls installed in the tank and connected to the controls in the water shed. Provide paved access from Town Hall Parking Lot to water shed. Pressure test and chlorination of water lines; activate and run booster pumps. Questions prior and following the site visit, are to be emailed to the Chief Procurement Officer at selectboard@brimfieldma.org. All questions received will be recorded, answered and emailed. If an addendum has been issued, the individual submitting the quote must acknowledge receipt of said addendum(s) and submit the acknowledgement with the quote. The last date to submit questions is Monday, November 25, 2024, by 1:00PM.

Award

Water / Sewer

$344,545.00

Public - City

Site Work

9

15

2

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
835
Active Projects
414
Bidding Soon
4,443
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

January 1, 2025

Project location map

23 Main St, Brimfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.