BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2025 at 7:00 PM

Updated January 18, 2025

Site work for a water / sewer project in Alpharetta, Georgia. Working plans call for site work for a water / sewer project.

Reference Number : 0000368312 Progressive Design Build for the replacement of the membrane system at the Johns Creek Environmental Campus. This project may also include the expansion of the treatment plant's capacity to 20MGD . This project will require all engineering, design, construction, materials and equipment procurement, and associated services, necessary to complete the design and construction of this work, as further described in Section 3. The work will take place at Fulton County's Johns Creek Environmental Campus (JCEC.). Question Deadline 01/03/2025 at 2:00 PM ET Questions are submitted online : Yes. Information regarding the bid or bid requirements, either procedural or technical, may be obtained by submitting questions to: Purchasing Contact Name: Darlene A. Banks Email: darlene.banks@fultoncountyga.gov. No permanent Rights of Ways or easements are anticipated to be required. All work is anticipated to take place within the JCEC property; however, any temporary Rights of Ways or easements would be obtained by the PDB Company, if necessary. Bid Bond 5.00 % Require E-Bonding Yes JCEC is located at 8100 Holcomb Bridge Rd, Alpharetta, GA 30022. Operating under NPDES Permit GA0038831, the plant treats wastewater from residential, commercial, and industrial users in north Fulton County. Wastewater from the collection system is pumped from the influent pump station through magnetic flow meters, then through automatic coarse screening and grit removal, then through primary clarifiers, fine screening and secondary biological treatment. Biological treatment consists of anaerobic, anoxic, aerobic/anoxic swing, and aeration zones. These zones provide for BOD, phosphorus, and ammonia treatment. After secondary treatment, the flow is filtered using ultra-filtration membranes, then U.V. disinfection and re-aeration prior to discharge to the Chattahoochee River. After the U.V. but prior to re-aeration, reuse water is pumped for onsite irrigation and distribution to customers through the reuse distribution system. The plant is permitted to discharge a combined total of 15 mgd monthly average flow to the river and reuse system. The Johns Creek Environmental Campus has been in operation since September 2009. Shortlist Confirmed.

Final Planning

Water / Sewer

$500,000.00

Public - County

Site Work

1

9

1179

9

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
200
Bidding Soon
2,260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

September 15, 2025

Project location map

8100 Holcomb Bridge Rd, Alpharetta, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.