Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 13, 2025 at 7:00 PM
Updated February 14, 2025
New construction of an educational facility in Covington, Georgia. Completed plans call for the construction of a educational facility.
As of February 2025, this project has not yet begun, however it is expected to start in March of 2025. NEWTON COUNTY NEW HIGH SCHOOL ATHLETIC FACILITIES ALCOVY HIGH SCHOOL- SHL-D06-23 EASTSIDE HIGH SCHOOL- SHL-D07-23 NEWTON HIGH SCHOOL- SHL-D08-23 NEWTON COUNTY MIDDLE SCHOOLS NEW CONCESSIONS BUILDINGS CLEMENTS MIDDLE SCHOOL - SHL-D09-23-A COUSINS MIDDLE SCHOOL - SHL-D09-23-B INDIAN CREEK MIDDLE SCHOOL - SHL-D09-23-C LIBERTY MIDDLE SCHOOL - SHL-D09-23-D VETERANS MEMORIAL MIDDLE SCHOOL - SHL-D09-23-E 1. Sitework December 05, 2024 2. Asphalt Paving / Curb & Gutter December 05, 2024 3. Fences and Gates December 05, 2024 4. Concrete December 05, 2024 5. Masonry December 05, 2024 6. Structural & Miscellaneous Steel December 05, 2024 7. Aluminum Canopies December 05, 2024 8. Roofing December 05, 2024 9. Doors, Frames, Hardware, & Installation December 05, 2024 10. Overhead Coiling Doors December 05, 2024 11. Aluminum Storefront / Glass and Glazing December 05, 2024 12. Drywall / Ceilings / EIFS / Metal Trusses December 05, 2024 13. Resilient Flooring, Carpet, Base & Accessories December 05, 2024 14. Epoxy Resinous Flooring December 05, 2024 15. Interior and Exterior Painting December 05, 2024 16. Specialties December 05, 2024 17. Laminate Clad Casework December 05, 2024 18. Plumbing December 05, 2024 19. Fire Protection – Sprinkler December 05, 2024 20. H.V.A.C. December 05, 2024 21. Electrical December 05, 2024 22. Aluminum Bleachers December 05, 2024 23. Landscaping December 05, 2024 24. Athletic Fields / Track Surfacing Previously Awarded 25. Exterior Athletic Lighting Previously Awarded 26. Scoreboards Previously Awarded It is the responsibility of the proposers to check for Addenda issued and to include all Addenda in their pricing. - Specification sections as referenced to in the bid package descriptions are for the convenience of bidders and in no way eliminates work required under the described package. Prospective bidders shall notify the Construction Manager if inconsistencies or discrepancies are discovered. Clarifications will be made upon written receipt of the Construction Manager prior to Five (5) Days of bid date. - Special attention is called to the General Conditions, Supplementary Conditions, General Requirements, General Package Notes and Construction Manager Special Conditions of the Project Manual as these requirements are to be followed for all bid packages. - Bidders of all packages shall include the pricing of any alternates affecting their work. - Any contractor penetrating a partition, floor or other work shall be responsible for the coordination, patching, and fire stopping. - Bidders certify that in submitting their proposal that they have thoroughly reviewed the contract documents, compared all documents to each other, visited the site, made allowances for the cost of the work and reported any discrepancy prior to submitting their proposal. - Any contractor who demolishes a surface to install new work shall patch back to the surface’s original condition if no new work is to be installed on that surface. If new work is to be installed on the patched surface, patching is required to adequately receive the new finish. - Any contractor disturbing any exterior work is responsible for its replacement. - Bid Bond – Special attention is called to bid packages requiring Bid Bonds. All Bid Bonds will be in the amount of 5% of bid and the bonding company shall be a surety company certified on the United States Department of the Treasury's Listing of Approved Sureties (Department Circular 570), and rated no less than "A" by A.M. Best ratings agency and acceptable to the Construction Manager. The form of bond shall be AIA Document A310, Current Edition. - Payment & Performance Bond – Special attention is called to bid packages requiring payment and performance bonds. All bonds are 100% Performance and Payment Bonds and the bonding company shall be a surety company certified on the United States Department of the Treasury's Listing of Approved Sureties (Department Circular 570), and rated no less than "A" by A.M. Best ratings agency and acceptable to the Construction Manager. Bonds to be submitted with Seven (7) Days of award of contract. - Upon submission of proposal, bidders certify that they are skilled in the trade of which they are proposing and will furnish acceptable references for a period of the last Five (5) Years. - Special attention is called to the fact that this is a FAST TRACK PROJECT. - Retainage of Five Percent (5%) will be held on all bid packages. A reduction of, or release of, retainage may occur per state law and with consent of the Architect, Construction Manager & the Owner. - Pay Requests are DUE to the Construction Manager on the 25th of each month. - The existing campus and buildings shall be kept operational at all times. - All proposers must comply with the bid package description BIDDERS NOTE: WHEN ORDERING PLAN DRAWINGS AND/OR SPECIFICATION SECTIONS, IT IS YOUR RESPONSIBILITY TO REVIEW THE CONTRACT DOCUMENTS AND SELECT THE REQUIRED DRAWING PAGE NUMBERS AND/OR SPECIFICATION SECTIONS YOU NEED. - ALL PROPOSERS AGREE THAT TIME IS OF THE ESSENCE.
Award
Educational
$35,500,000.00
Public - County
New Construction
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2024
March 3, 2025
Multiple Locations, Covington, GA
Related To This Project
Covington, GA
Bid Date: Dec 18 2024
Covington, GA
Bid Date: Jan 02 2025
Covington, GA
Bid Date: Jan 17 2025
Covington, GA
Bid Date: Oct 08 2021
Covington, GA
Bid Date: Jan 14 2021
Covington, GA
Bid Date: Feb 16 2021
Covington, GA
Bid Date: Feb 19 2021
Covington, GA
Bid Date: Jan 14 2021
Covington, GA
--
Covington, GA
--
Covington, GA
--
Covington, GA
Bid Date: Nov 14 2024
Covington, GA
Bid Date: Nov 21 2024
Covington, GA
Bid Date: Nov 21 2024
Covington, GA
Bid Date: Nov 21 2024
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.