EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 12, 2024 at 7:00 PM

Updated October 1, 2024

Site work, paving, new construction and renovation of a mixed-use development in Hillsboro, Illinois. Completed plans call for the construction of a sidewalk / parking lot; for the renovation of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; water / sewer project; water / sewer project; and water / sewer project.

Project Description: Project includes concrete foundations, slab and stoops for post frame building already procured and to be constructed by Stutz Excavating, Inc. Work also includes related grading, paving, plumbing, electrical, storm sewer and sanitary sewer indicated on Drawings and in these Specifications. additional doc acq note: Bidding Documents, Drawings and Specifications, may be examined by prospective bidders and material suppliers at the offices of Hurst-Rosche, Inc., 1400 E. Tremont St., Hillsboro, Illinois The documents are being provided for reference purposes only. Bidders are encouraged to obtain a signed and sealed hard copy set of the bidding documents. At a minimum, bidders must obtain clean copies of bid forms from the offices of Hurst-Rosche, Inc. by paying a non-refundable amount of $10.00 to submit a bid for this project. Construction shall commence early Spring 2025. Site, utility, and concrete work shall be completed within 56 calendar days from the issued Notice to Proceed. The next 56 calendar days are reserved for the erection of the building by others. Interior electrical work shall be completed after the 56-day building erection period. Bidders will be required to provide Bid security of a sum no less than 10 percent of the Bid Sum. The bid security shall be either certified check, cashier's check, bank money order or bid bond issued by surety licensed to conduct business in the State of Illinois. Hereinafter this bid security shall be referred to as the bid bond. Submit two copies of your Bid on the Bid Form provided. Bidders may supplement this form as appropriate. Your Bid will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. The Owner reserves the right to accept or reject any or all Bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the Owner. Latest Time to Submit Request for Interpretation: November 22, 2024 @ 4:30 PM

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$787,700.00

Public - County

New Construction, Paving, Renovation, Site Work

20

10

13

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Quality Requirements, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Vapor Retarders
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Backfill, Earthwork Methods, Soil Treatment, Rodent Control, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
56
Bidding Soon
828
All Active Projects
430
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

January 3, 2025

img_map_placeholder

11159 IL-185, Hillsboro, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Heavy Equipment Shed - Bid Package 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.