Site work for a water / sewer project in Milladore, Wisconsin. Completed plans call for site work for a water / sewer project.
Village of Milladore is requesting Bids for the construction of the following Project: WWTF CHEMICAL ADDITION UPGRADE The Project includes the following Work: Concrete flatwork, chemical feed systems, site piping, and electrical work. The anticipated substantial completion date is October 30, 2025, and final completion date is November 30, 2025. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than online. Instructions to Bidders. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with the wage rate scale established by Federal Davis Bacon Wage Rates. We encourage Disadvantaged Business Enterprises (DBEs), including Minority- owned Business Enterprises (MBES), Women's Business Enterprises (WBEs), and Small Businesses in Rural Areas (SBRAs) to submit bid proposals. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontracts, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at online. Owner reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the Village of Milladore. Question Deadline 11/26/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Mike Voss, PE, 715-304-0456 | mvoss@msa-ps.com 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.
Post-Bid
Water / Sewer
$1,700,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2024
February 3, 2025
To Be Determined, Milladore, WI
Related To This Project
Milladore, WI
Bid Date: Jun 11 2024
Milladore, WI
Bid Date: May 05 2024
Milladore, WI
Bid Date: Mar 06 2022
Milladore, WI
Bid Date: Mar 22 2023
Milladore, WI
Bid Date: Jun 05 2022
Milladore, WI
Bid Date: May 10 2022
Ashland, WI
Bid Date: Dec 03 2024
La Crosse, WI
--
Hobart, WI
Bid Date: Jul 12 2019
Star Lake, WI
Bid Date: May 11 2021
De Pere, WI
Bid Date: Jul 11 2019
De Pere, WI
Bid Date: Mar 12 2019
De Pere, WI
Bid Date: Apr 04 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.