Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.
HPW-PFW Misc Small Diameter Waterline, Fire Hydrant and Valve Rehabilitation and Repairs-Package III Scope The purpose and intent of this contract will be to award a qualified vendor to perform repairs of primarily small-diameter water lines using clamps or wraps, replacement and/or new installation of small-diameter water lines, valves, and appurtenances (20 inches in diameter and smaller), including mobilizing and cooperating with the City of Houston to develop appropriate rehabilitation solutions for water lines resulting from emergency breaks, leaks, and customer complaints. Work under this project shall also include the replacement of fire hydrants and associated valves as needed. The amount of work to be performed may vary from no construction activity to the mobilization of multiple crews to meet multiple Work Order requirements as detailed in Doc 00410B-Bid Form and Doc 01110-Summary of Work of this Project manual. A. Work shall include repairs of primarily small diameter water lines using clamps or wraps, replacement and/or new installation of small diameter water line, valves and appurtenances (20 inches in diameter and smaller), including mobilizing and cooperating with City to develop appropriate rehabilitation solutions for water lines resulting from emergency breaks, leaks and customer complaints. Work under this project shall also include the replacement of fire hydrants and associated valves as needed. The amount of work to be performed may vaiyfrom no constmction activity to timeswhen contractorshall be required to mobilize multiple crewsto meet multiple Work Orderrequirements. The work items shall be as per Document 00410B- Bid Form, Part B of this Project manual. All debris, except Valves and Fire Hydrants shall be disposed of at a lawful disposal site at the Contractor's expense. Restoration work, including pavement of driveways, sidewalks, streets, trees and special landscaping after the necessary "repair" jobs are also covered as per Document 00410B- Bid Form, Part B. B. All valves and fire hydrants that are removed and/or replaced shall be returned to the City of Houston (7101 Renwick, Houston TX 77081) at the end of each month. Contact Project Manager or designee by email at least 24 hours in advance. All returned materials must not be missing patis and should be returned in the condition found at work site. D. Installation of new water mains up to 5,000 LF may be requested. E. Contractor shall make evety effort not to damage or disturb existing driveways, sidewalks, curbs, vegetation, fire hydrants, other utility lines and service connections. 1. Demolition of sidewalks or driveways to be scheduled at the end of construction keeping impact on pedestrians to a minimum. Sidewalks to be ADA compliant and shall be kept free of equipment, materials and debris during construction. 2 Replacement of sidewalks should always be constructed to maintain partial sidewalk access during waterproofing and re-installation of sidewalk. In the event metal plates are used to allow the temporary opening of a street, driveway or sidewalk, these shall have skid-resistant surface. 3. Concrete and site/yard work, including pavement of driveways, sidewalks and streets repairing and/or resurfacing of concrete, asphalt and/or lawn areas and any associated work ("restoration") shall be completed within (9) days after the repairs are completed. o The minimum thickness of drivewaypavingis 6 inches for single family use and 7 inches for others, or as existing in case it exceeds the minimum. Question Deadline 11/26/2024 Bidder shall immediately submit Document 00220, Request for Bid Information, to Project Manager upon finding errors, discrepancies, or omissions in Bid Documents. Confirmation of receipt of questions by the City is the responsibility of Bidder. Verbal discussions and answers are not binding.
GC Bidding
Water / Sewer
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2024
January 6, 2025
Multiple Locations, Houston, TX
Related To This Project
Houston, TX
Bid Date: Dec 05 2024
Houston, TX
Bid Date: Dec 06 2024
Houston, TX
Bid Date: Dec 05 2024
Houston, TX
Bid Date: Dec 10 2024
Houston, TX
Bid Date: Dec 03 2024
Houston, TX
--
Houston, TX
Bid Date: Nov 27 2024
Houston, TX
Bid Date: Dec 12 2024
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Dec 03 2024
Houston, TX
Bid Date: Nov 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.