BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2025 at 7:00 PM

Updated January 8, 2025

Site work for a water / sewer project in Greenville, North Carolina. Completed plans call for site work for a water / sewer project.

Stallings Stadium Drainage Contact: Mike Watson for project questions at: mwatson@greenvillenc.gov Scope of Work: In the base bid, provide material, equipment, and labor to provide and install a trench drain, piping, an underground storage tank and a storm drain inlet per the construction plans and specifications. Alternate #1 is to remove and replace a section of the asphalt greenway to improve drainage. Start Date: Jan 1, 2025 A. The extent of the work required under this section is that required to minimize water, air, and noise pollution and soil erosion and siltation. B. Temporary erosion control measures which may be necessary include, but are not limited to, temporary seeding, temporary berms, dikes, dams, drainage ditches, silt basins, silt ditches, perimeter swales, slope drains, structures, vegetation, mulches, mats, netting, gravel or any other methods or devices that are necessary to control or restrict erosion. Temporary erosion control measures may include work outside the right-of-way or construction limits where such work is necessary as a result of construction such as borrow pit operations, haul roads, plant sites, equipment storage sites, and disposal of waste or debris. The Contractor shall be liable for all damages to public or private property caused by silting or slides originating in waste areas furnished by the Contractor. C. Related Work Specified Elsewhere: Earthwork: Section 02300 Clean-up and Seeding: Section 02228 A. The work covered by this section consists of disposal of waste and debris, preparing seedbeds, furnishing, placing, and covering limestone, fertilizer, and seed; compacting seedbeds; furnishing, placing, and securing mulch; and other operations necessary for the permanent establishment of grasses from seed; all in accordance with these specifications and drawings. B. Waste will be considered to be all excavated materials which are not utilized in the construction of the project. C. Debris will be considered to be all undesirable material encountered or left on the project site. D. Permanent Seeding is required for all areas disturbed by construction, except for areas covered by structures, pavements, etc. E. Temporary Seeding of disturbed areas shall be performed whenever one or more of the following conditions exist. 1. The Engineer determines that temporary seeding is necessary to prevent or stop erosion of disturbed areas. 2. Work is suspended or delayed on any portion of the project for 15 calendar days (10 calendar days within NCDOT right of way) and the potential for erosion exists. 3. Whenever permanent seeding is delayed beyond that required by the Contract Documents. F. The Contractor shall adapt his operations to variations in weather or soil conditions as necessary for the successful establishment and growth of the grasses. G. In all operations covered by this section, care shall be taken to preserve the required line, grade, and cross section of the work area.

Award

Water / Sewer

$145,000.00

Public - City

Site Work

5

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
76
Bidding Soon
903
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 1, 2025

Project location map

1055 S Elm St, Greenville, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.