BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Cleveland, Tennessee. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Estimated Schedule for Performance of Work Estimated Pe-nepa Phase: 5/15/2026 Through 9/30/2026 Estimated Design Phase: 10/1/2026 Through 6/30/2027 Estimated Advertisement of Construction Project: 10/15/2027 Through 11/15/2027 Pre-construction Conference, 12/1/27 Beginning of Construction, 2/1/2028 Completion of Construction 8/30/2028 Completion of Project Administration 10/31/2028 etain the Services of a Professional Consultant Engineering Firm to Provide Services Related to Construction of the Milling and Resurfacing of Peerless Road From Paul Huff Parkway to Georgetown Road Pin 134746.00. The Project Shall Be Accomplished in Accordance With Tdot Local Programs Guidelines. The Professional Consultant Engineering Consulting Firm Must Be on Tdot's Pre-approved List or Have a Completed Pre-qualification Form Filed With Tdot by the Deadline for the Letters of Interest. The Prequalified Firm Must Have Unlimited Status. Scope of Services Prepare Required Documentation for Environmental Clearances in Compliance With the National Environmental Policy Act Develop Plans, Specifications, Contract Documents, Bid Quantities and Engineering Cost Estimate That Meet or Exceed All Federal and State Guideline Coordinate With Utilities Regarding Encountered Utility Conflicts if Any, No Right-of-way Acquisitions is Required for This Project. Prepare All Required Bid Documents. Follow Requirements of the Current Edition of Tdot's "local Government Guidelines for the Management of Federal and State Funded Transportation Projects" Which Includes Submittals for Approval of Environmental Documentation, Permitting, Engineering Design, Utility Relocations, Right-of-way, and Disadvantaged Business Enterprises (Dbe). Construction Engineering & Inspection. Material Testing and Reporting. Coordination With Utility Companies Relative to Utility Conflicts and With Property Owners Neighboring the Project in the Project Scope. The method of Contractor Selection has not been Determined at this time. A. Workload Capacity, to Include the Amount of Work Under Contract With the City of Cleveland or Similar Sized City (15%) B. Past Performance on the City of Cleveland or Similar Sized City Projects (15%) C. Experience and Qualifications of the Firm Specific to Milling and Resurfacing Projects) (50%) D. Size of Project and Limited or Unlimited Prequalification Status Including Evidence That the Firms Experience Derives From Project That Are Comparable or Larger in Size to That Expected in This Contract (20%) E. ( %) the Consultant Evaluation Committee Holds the Ability to Conduct Interviews Based on Scoring as Phase Iii Evaluation.

Conceptual

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
101
Bidding Soon
1,308
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2028

Project location map

Peerless Rd NW, Cleveland, TN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.