Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
Renovation of an educational facility in Pocatello, Idaho. Completed plans call for the renovation of a educational facility.
DESCRIPTION OF PROJECT The scope of work includes the existing HVAC systems and teaching spaces in the Plant Science Building at Idaho State University. Due to age and capacity, the building has been experiencing adverse conditions with the changing seasons. Failed components, inadequate cooling/heating, and in some cases the complete lack of an HVAC system renders some spaces unusable and hinders the use of equipment used for research and instruction. ISU has established three (3) priorities: 1 will be a revamp of the building's HVAC systems, to include the greenhouses, the Growth Chamber room, the Headhouse and associated workroom, the lobby, and the classrooms. 2 will be improving the teaching greenhouse spaces (110, 111) and the research greenhouse spaces (112, 113). The improvements will be replacing lab benches, overhead lighting, and installation of a new filtered/automated watering system. An additional unused drying closet in workroom #104 can be reclaimed for additional space. 3 will be classroom improvements, to include finish updates, new and improved technology and A/V systems, and an evaluation of the installation of a center aisle in the lecture hall (114). Last day to submit RFQ Questions 07/03/25 All questions must be sent to the DPW Project Manager: John Parham, Project Manager Division of Public Works 502 N. 4th St. PO Box 83720 Boise ID 83720-0072 (208) 332-1909 John.parham@adm.idaho.gov The State reserves the right to reject any or all proposals received as a result of this request. A total project budget has been established at $2,127,109.00 and includes fees (A/E and CM/GC), commissioning services, contingencies, tests, and other project related expenses. A construction budget has been set at $1,680,000.00. The scope of work includes the existing HVAC systems and teaching spaces in the Plant Science Building at Idaho State University. Due to age and capacity, the building has been experiencing adverse conditions with the changing seasons. Failed components, inadequate cooling/heating, and in some cases the complete lack of an HVAC system renders some spaces unusable and hinders the use of equipment used for research and instruction. ISU has established three (3) priorities: #1 will be a revamp ofthe building's HVAC systems, to include the greenhouses, the Growth Chamber room, the Headhouse and associated workroom, the lobby, and the classrooms. #2 will be improving the teaching greenhouse spaces (110, 111) and the research greenhouse spaces (112, 113). The improvements will be replacing lab benches, overhead lighting, and installation ofa new filtered/automated watering system. An additional unused drying closet in workroom #104 can be reclaimed for additional space. #3 will be classroom improvements, to include finish updates, new and improved technology and A/V systems, and an evaluation ofthe installation ofa center aisle in the lecture hall (114). A total project budget has been established at $2,127,109.00 and includes fees (A/E and CM/GC), commissioning services, contingencies, tests, and other project related expenses. A construction budget has been set at $1,680,000.00. A complete construction cost estimate and construction schedule will be required following CM/GC's review ofthe Schematic Design set of drawings and must be updated throughout the Construction Documents process
Post-Bid
Educational
$1,680,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2025
November 17, 2025
921 S 8th Ave, Pocatello, ID
Related To This Project
Pocatello, ID
Bid Date: Nov 21 2024
Pocatello, ID
Bid Date: Nov 26 2024
Pocatello, ID
Bid Date: Aug 01 2025
Pocatello, ID
--
Pocatello, ID
Bid Date: Mar 27 2025
Pocatello, ID
Bid Date: Jan 28 2025
Pocatello, ID
--
Pocatello, ID
Bid Date: Jan 30 2025
Pocatello, ID
--
Pocatello, ID
Bid Date: Feb 05 2025
Pocatello, ID
--
Pocatello, ID
Bid Date: Nov 19 2024
Pocatello, ID
--
Pocatello, ID
Bid Date: Nov 14 2024
Pocatello, ID
Bid Date: Nov 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.