Site work for a bridge / tunnel in New Fairfield, Connecticut. Completed plans call for site work for a bridge / tunnel.
The Town of New Milford is requesting proposals from qualified professional firms, licensed in the State of Connecticut, to provide bridge over coating (painting) for the Town. Question Submission Deadline:December 2, 2024, 8:00am Question Response Deadline:December 5, 2024, 5:00pm The hours of operation are typically Monday through Friday 7:30 a.m. to 4:00 p.m. Depending upon the project, work hours may extend beyond 4:00 p.m. but typically not beyond 5:00 p.m. The commencement time of the work will begin as directed by the Public Works Supervisor. 4.2. Scope of Work The winning bidder must comply with all environmental, health, and safety standards for painting of outdoor steel structures. 1. Contractors and subcontractors are required to have at least one (1) Coating Application Specialist (CAS) (SSPC ACS/NACE No. 13)-certified (Level II-Interim Status-Minimal) craft-worker. 2. CAS-certified craft-worker(s) are required for all crews/craft- workers up to four (4) crew members. 3. For each crew larger than four (4), an additional CAS-certified craft-worker shall be present on each painting/blasting crew during blast cleaning and spray application (Atmospheric and Immersion Service) operations. 4. A crew member is a person who is on the job performing hand-held nozzle blast cleaning and/or spray application of protective coatings on a steel structure. The certification(s) must be full, not interim, and must be kept current for the duration of the Project work. If a Contractor's, subcontractor's or any craft-worker's certification expires, the firm will not be allowed to do any work on this item until the certification is reissued. 5. The winning bidder must provide and use all protective measures to protect the environment around the bridge and the river below from contamination from the prepping and painting process. 6. All loose and flaking paint, rust spots and bare spots must be prepped and primed prior to final coat of paint using appropriate cleaning and priming materials. 7. Final coat of paint must meet all environmental standards and not contain any hazardous materials. a. Additional Resource/Information can be found on the U.S. Department of Transportation Federal Highway Administration website 8. Application Methods: The coating system shall be applied by spray equipment of a type and size capable of applying each coat within the required thickness range. 9. The applicator shall strictly adhere to the manufacturer's written recommendations for application methods, cure times, temperature and humidity restrictions and recoat times for each individual coat of the specified system. However, in no case shall coatings be applied in ambient conditions that exceed the relative humidity and dew point temperature control limits specified herein. 10. Brushes shall be used in areas where spray application will not achieve acceptable results. Brushing technique shall be performed in a manner that will provide a uniform, blended finish. 11. All storage, mixing, thinning, application and curing techniques and methods shall be accomplished in strict accordance with the printed material data sheets and application instructions published by the respective coating material manufacturer. 12. Surfaces shall be painted with the specified prime coat material before the end of the same work shift that they were blast cleaned and before any visible rust back occurs. 13. Applied coatings shall not have runs, sags, holidays, pinholes or discontinuities. 14. The winning bidder must provide a 24 month warranty against chipping, rusting or any other type of failure after painting is completed under normal wear and tear conditions. 15. The Contractor shall provide at least one (1) Coating Inspector who is a National Association of Corrosion Engineers (NACE) Certified Coating Inspector Level 3 with Peer Review for the duration of the field application to provide Quality Control. 16. The QC Inspector shall provide a report to inform the town Engineer on a daily basis, of the progress and any corrective actions performed on the coating work. 17. The QC Inspector shall be present during all cleaning and coating operations. 18. The winning bidder must complete the project no later than July 1, 2025.
Sub-Bidding
Bridges / Tunnels
$785,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2024
January 13, 2025
178 Short Woods Rd, New Fairfield, CT
Related To This Project
New Fairfield, CT
Bid Date: Oct 17 2024
New Fairfield, CT
Bid Date: Jun 20 2024
New Fairfield, CT
Bid Date: May 16 2024
New Fairfield, CT
Bid Date: Apr 09 2024
New Fairfield, CT
Bid Date: Oct 16 2020
New Fairfield, CT
Bid Date: Dec 29 2023
New Fairfield, CT
Bid Date: Nov 08 2023
New Fairfield, CT
--
New Fairfield, CT
--
New Fairfield, CT
--
New Fairfield, CT
Bid Date: Oct 05 2021
New Fairfield, CT
Bid Date: Nov 30 2020
New Fairfield, CT
--
New Fairfield, CT
Bid Date: May 31 2023
New Fairfield, CT
Bid Date: May 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.