BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Lakeland, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; bridge / tunnel; and bridge / tunnel.

Counties: Polk Road Name: Resurface & Safety Polk Pkwy SR 570 Mp8 to Mp17, Polk Cty Limits: 16470000 Project(s): 44968815201Federal Aid No: N/A Project(s): 44968825201(*) Federal Aid No: N/A Total Roadway Length: 33.867 Miles Total Bridge Length: 0.859 Miles Total Proposal Length: 34.726 Miles Contract Days: 308 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Please read the full advertisement Description: The Improvements under this Contract consist of work for multiple FPID's; 449688-1-52-01 and 449688-2-52-02. The purpose is to provide improvements to drainage, signing and pavement markings, structures, ITS, and to mill and resurface SR 570 (Polk Parkway) and the interchange ramps from MP 8 to MP 17 in Polk County. Question Deadline 01/07/2025 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - Milling and Resurfacing - SR 570

GC Bidding

Roads / Highways

$20,770,148.00

Public - State/Provincial

Paving, Site Work

198

5

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
62
Bidding Soon
1,367
All Active Projects
552
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

January 24, 2025

img_map_placeholder

Polk Pkwy, Lakeland, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.