Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 7, 2025 at 7:00 PM
Updated January 8, 2025
Renovation of a municipal facility in New Bedford, Massachusetts. Completed plans call for the renovation of a municipal facility.
Project Manager: Jason Urso Project Location: 75 N. 6th Street New Bedford, MA Project Name: New Bedford 3rd District Courthouse - Chiller & Boiler Plant Replacement Contract Number: IFB #25-02 SRF/Funding Agency Number: General Bid Date: 12/03/24 Sub-Bids Electrical and Plumbing - 11/29/24 02:00 PM Pre-Bid Conference: 11/20/24 at 16:30 PM - Non-Mandatory Project Scope: Replacement of the existing chiller and boiler plants including, but not limited to the chiller, boiler, pumps, expansion tanks, air separators, piping and valves, boiler flue and combustion air intake, natural gas piping, circuit breakers, conduit, and wiring. Installation of a new chilled water bypass line in the Penthouse Mechanical Room. New panelboards will serve new mechanical loads. Partial demolition and reconstruction of the chimney will be required to install flues for the new condensing boilers and the existing domestic water heater All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Owner via email at tmoutinho@countyofbristol.net. Prospective Bidders are responsible for ensuring their questions are received by the Owner. In order to receive consideration, questions must be received by Owner by 12:00 p.m., Friday, November 29, 2024. The Work includes the following major items: a. Demolition of the existing chiller plant and boiler plant equipment and piping. b. New air source heat pump chiller, appurtenances, controls, and chilled water piping. c. New condensing hot water boiler plant, appurtenances, controls, and hot water piping. d. Flues for the new boilers and existing domestic water heater. e. Electrical conduit, power, circuit breakers, subpanels for the new equipment. f. Natural gas piping modifications to serve the new boilers. g. Partial demolition of the existing chimney wall in the ground floor mechanical room and cap to install new flues. Bid Result ELECTRICAL American Electrical: $595K PLUMBING: United Plumbing & Heating: $23K
Bid Results
Municipal
$618,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 29, 2024
January 1, 2025
75 N 6th St, New Bedford, MA
Related To This Project
New Bedford, MA
Bid Date: Apr 28 2025
New Bedford, MA
Bid Date: Apr 11 2025
New Bedford, MA
--
New Bedford, MA
Bid Date: Nov 22 2024
New Bedford, MA
Bid Date: Dec 11 2024
New Bedford, MA
Bid Date: Nov 27 2024
New Bedford, MA
Bid Date: Oct 29 2020
New Bedford, MA
Bid Date: Feb 03 2025
New Bedford, MA
Bid Date: Dec 11 2024
New Bedford, MA
Bid Date: Nov 29 2024
New Bedford, MA
Bid Date: Dec 18 2024
New Bedford, MA
Bid Date: Dec 06 2024
New Bedford, MA
Bid Date: Nov 22 2024
New Bedford, MA
Bid Date: Feb 12 2025
New Bedford, MA
Bid Date: Nov 13 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
