BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in New Bedford, Massachusetts. Completed plans call for the renovation of a municipal facility.

Project Manager: Jason Urso Project Location: 75 N. 6th Street New Bedford, MA Project Name: New Bedford 3rd District Courthouse - Chiller & Boiler Plant Replacement Contract Number: IFB #25-02 SRF/Funding Agency Number: General Bid Date: 12/03/24 Sub-Bids Electrical and Plumbing - 11/29/24 02:00 PM Pre-Bid Conference: 11/20/24 at 16:30 PM - Non-Mandatory Project Scope: Replacement of the existing chiller and boiler plants including, but not limited to the chiller, boiler, pumps, expansion tanks, air separators, piping and valves, boiler flue and combustion air intake, natural gas piping, circuit breakers, conduit, and wiring. Installation of a new chilled water bypass line in the Penthouse Mechanical Room. New panelboards will serve new mechanical loads. Partial demolition and reconstruction of the chimney will be required to install flues for the new condensing boilers and the existing domestic water heater All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Owner via email at tmoutinho@countyofbristol.net. Prospective Bidders are responsible for ensuring their questions are received by the Owner. In order to receive consideration, questions must be received by Owner by 12:00 p.m., Friday, November 29, 2024. The Work includes the following major items: a. Demolition of the existing chiller plant and boiler plant equipment and piping. b. New air source heat pump chiller, appurtenances, controls, and chilled water piping. c. New condensing hot water boiler plant, appurtenances, controls, and hot water piping. d. Flues for the new boilers and existing domestic water heater. e. Electrical conduit, power, circuit breakers, subpanels for the new equipment. f. Natural gas piping modifications to serve the new boilers. g. Partial demolition of the existing chimney wall in the ground floor mechanical room and cap to install new flues.

Post-Bid

Municipal

$3,200,000.00

Public - County

Renovation

26

15

10

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
130
Bidding Soon
2,310
All Active Projects
1,007
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2024

January 1, 2025

img_map_placeholder

75 N 6th St, New Bedford, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.