BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Stockton, California. Completed plans call for the renovation of a educational facility.

Bid Package MO2024 131 ("Project" or "Contract"). The Project consists of all labor, materials, equipment and services necessary to: o Follow district specifications - Exhibit A. o Follow manufacture Specifications - Exhibit B. o Verify square footage and work areas prior to notice to proceed. o Supply the district with material and color samples, prior to award. o Produce project maps outlining areas for replacement, areas that are not being replaced, laydown/storage area, garbage bin area, etc., prior to notice to proceed. o Work with the district to produce a project schedule, prior to mobilization. o Moving and storing any and all furniture, boxes, supplies, etc. prior to start of demo and replacing all items back in their original location after installation is complete. o Demo and legally dispose of any and all cove base, flooring, and construction waste. o Any and all subfloor preparations as expressed in exhibit A & B (subfloor). o Purchase and install, (to manufacture specifications) new flooring material, equal too or greater than "Tarkett's Event Collection" LVP (Luxury Vinyl Plank). * LVP material must have a wear thickness equal too or greater than 30 mil (0.76) *. o Purchase and use flooring adhesive equal too or greater than "Tarkett 959HM (High Moisture) adhesive". o Purchase and install new 4" or 6" black cove base in any and all areas where cove base was removed and under and around all built in cabinets and furniture. o Purchase and install new reducers, transitions, and thresholds as needed for transitions, grade changes and door openings. o Notify district at point of substantial completion and assist in scheduling a punch walk prior to replacing furniture. o Final cleaning and punch walk of new flooring after furniture is moved back in. Question Deadline 11/29/2024 All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to Alan Cox, Engineering Technician, adcox@stocktonusd.net .

Sub-Bidding

Educational

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

26

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
92
Bidding Soon
1,926
All Active Projects
803
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2024

January 8, 2025

img_map_placeholder

Multiple Locations, Stockton, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.