BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2025 at 7:00 PM

Updated February 6, 2025

Site work for a water / sewer project in Regina Beach, Saskatchewan. Completed plans call for site work for a water / sewer project.

Katepwa Dam is located on the eastern outlet of Katepwa Lake and consists of earth embankments, a concrete control structure, and a timber weir. WSA intends to make various improvements and Public Interaction Around Dams (PIAD) safety upgrades at the site, summarized as follows: Construction of rock spur and installation of safety boom, complete with anchor piles at both extents and at midspan as well as a solar-powered beacon Centre island erosion protection and construction of a sediment trap upstream of the existing concrete control structure Channel improvements downstream of the timber weir Miscellaneous steel fabrication and installation at the existing concrete control structure Reinforcement of the timber weir abutments Supply and installation of PIAD upgrades and other signage at site These upgrades are intended as medium-term interim measures until the existing structure(s) can be replaced with new. Timeline for replacement is equal to or greater than 15 years. Construction work is intended to begin in the winter of 2024/2025 with the anchor installation. Construction must be suspended in spring to allow for spring spawning window and to pass the spring runoff flows. Fall spawning window will also suspend construction.

Award

Water / Sewer

$5,030,360.00

Public - State/Provincial

Site Work

77

30

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
13
Bidding Soon
176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

January 6, 2025

Project location map

Katepwa, Regina Beach, SK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.