Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
New construction of an educational facility in Beaverton, Oregon. Completed plans call for the construction of a 249,662-square-foot, two-story above grade educational facility.
SCOPE OF WORK P&C Construction (P&C), as the CM/GC firm selected by Beaverton School District (BSD), is seeking a qualified subcontractor for preconstruction services and supply/install of the electrical for the Aloha High School Mechanical Upgrade project. Proposing firm must be skilled in working on occupied K-12 campuses, developing detailed phased schedules, estimates, performing value engineering, early procurement, studying labor conditions, understanding construction methods and techniques, monitoring, and documenting costs, and coordinating and communicating the activities of the firm through the design and construction phases specifically for k-12 school projects. The proposer must include all trade scope identified in this package. SCOPE OF WORK DOCUMENTS The scope of work for this project is provided and defined in the 90% Schematic Design D Project Scope The scope of this Aloha High School Mechanical Modernization project is to remove and replace or upgrade existing mechanical equipment, upgrade mechanical controls and remove and replace ceiling and lighting in the affected work areas. Structural work may include strengthening of the existing framing to support new mechanical units as well as coordination of new mechanical penetrations through the existing roof and shear walls. The project is expected to include the following scope: o Investigation of existing conditions o Mechanical equipment replacement in ground floor areas, see Figure 1 o Mechanical equipment refurbishment in mezzanine areas o Mechanical control upgrades o Removal and replacement of existing ceilings and lighting in the affected work areas o Patch and repair any walls affected by the work o Provide new intake and exhaust hoods on the roof to serve new equipment, and infill and repair the roof where any existing hoods are removed
Post-Bid
Educational
$500,000.00
Public - City
New Construction
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2024
April 1, 2025
18550 SW Kinnaman Rd, Beaverton, OR
Related To This Project
Beaverton, OR
Bid Date: Nov 11 2020
Beaverton, OR
Bid Date: Dec 17 2024
Beaverton, OR
--
Beaverton, OR
Bid Date: Dec 19 2024
Beaverton, OR
Bid Date: Dec 10 2024
Beaverton, OR
Bid Date: Dec 19 2024
Beaverton, OR
Bid Date: Jan 14 2025
Beaverton, OR
Bid Date: Dec 19 2024
Beaverton, OR
Bid Date: Dec 10 2024
Beaverton, OR
Bid Date: Nov 21 2024
Beaverton, OR
--
Beaverton, OR
Bid Date: Dec 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.