Demolition, site work and addition to an educational facility in Hartman, Arkansas. Completed plans call for the addition of a 32,535-square-foot, two-story above grade educational facility; for the demolition of a educational facility; and for site work for a educational facility.

BID PACKAGES 01 Site Work 02 Asphalt Paving and Striping 03 Selective Demolition 04 Termite Control 05 Utility Demolition/Relocation06 Concrete 07 Masonry 08 Structural & Miscellaneous Steel Material Only 09 Structural & Miscellaneous Steel Installation Only 10 Rough and Finish Carpentry 11 Architectural Woodwork(cabinets) 12 Waterproofing and Joint Sealants 13 Roofing and Sheet Metal including Tapered Insulation System14 Penetration Fire-stopping System 15 Hollow Metal Doors and Frames, Wood Doors, and Finish Hardware Material Only 16 Hollow Metal Doors and Frames, Wood Doors, and Finish Hardware Installation Only 17 Aluminum Storefront Systems, Glass and Glazing including Aluminum Windows 18 Metal Studs, Gypsum Board, Acoustical Panels, and Acoustical Ceilings 19 Carpet and Rubber Base 20 Modular Athletic Flooring 21 Polymer Floor System andWall Base 22 Painting 23 Specialties Material Only 24 Specialties Installation Only25 Commercial Kitchen Equipment 26 Stage Curtains 27 Window Treatment andRoller Shades 28 Hydraulic Passenger Elevator 29 Wet-Pipe Fire SuppressionSystem 30 Plumbing and Gas Piping 31 Heating and Ventilation System 32 Electrical and Communications 33 Combination Bid Package Question Deadline 12/11/2024 at 2:00 PM CT, Requests for information, clarifications, and questions shall be submitted to the Construction Manager Project engineer shall issue addendums as he deems appropriate to answer questions. Each bid will include a bid bond in the amount of 5% of the total bid offered payable to Van Horn Construction, Inc., if bid exceeds$50,000. It will be in the form of a cashier's check or insurance surety bond using AIA DocumentA310 with Power of Attorney attached. Bond is to be made payable to Van Horn Construction, Inc. A "Performance and Payment Bond" or a "Material Supply Bond" in the amount of 100% ofthe total amount of the bid, will be furnished by the successful bidder if exceeding $50,000, within ten(10) days after receipt of the Owner's, referred to in this specification, intent to award notice. Failure to furnish the required bonds may cause forfeiture of bid guarantee to the owner as liquidated damages. The "Performance and Payment Bond" or the" Material Supply Bond" will be in the amount equal to 100% of the contract price as security for the faithful performance of this contract price and for payment of all indebtedness for labor and materials furnished or performed in connection with this contract. The bond will be written by a surety company which is qualified and is authorized to do business in the State of Arkansas, according to A.C.A. 22-9-402(a)(b) and filing with said bond, his power of attorney as his authority. The bond will be written in favor of the Construction Manager and executed per Arkansas state law. An original and two (2) copies of the bond must be furnished, with power of attorney attached to each. All bidders must be licensed in the State of Arkansas, as provided by Act 142 of 1967,amended by Act 293 of 1969, and Act 397 of 1971, and Act 546 of 1971, as enacted by the General Assembly of the State of Arkansas. To be considered, bidders must be licensed on day of bid opening. By providing a bid, firms accept the obligation to honor bids for a period of 60 days after the bid openings. Subcontractor's attention is called to the Owner's requirement of mandatory background checks of all employees who will physically be on the Owner's property. Please list on your bid proposal the number of employees you will have on site to complete the project. VHC will cover the cost for this listed number. If any additional employees are used, it will be at Subcontractor's expense. The Owner and Construction Manager reserve the right to reject any or all bids, based on availability of funding, to waive formalities in the bids received, to evaluate bids, and to accept any bid or bids which, in their opinion, may be in the best interest of the Owner.

Sub-Bidding

Educational

$5,000,000.00

Public - County

Addition, Demolition, Site Work

103

32

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
37
Bidding Soon
436
All Active Projects
184
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

February 17, 2025

img_map_placeholder

193 School St, Hartman, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.