Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 24, 2025 at 7:00 PM
Updated October 1, 2024
Site work and outdoor lighting for a mixed-use development in Compton, California. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.
Question Deadline 11/27/2024 at 5:00 PM PT All project, technical, and contract related questions and questions concerning this Request for Proposals (RFP) should be directed to Salian Garcia, Budgets and Administration Officer, in writing at sgarcia@rmc.ca.gov. The Alondra Gateway Park project is an approximately half-acre (20,343 square feet) park that will be located on the east side of Compton Creek, south of Alondra Boulevard in the City of Compton (Exhibit A). The park will be built on a flat triangular-shaped vacant lot that is currently owned by the City of Compton (City). The project includes the development of the following: a small picnic area, a seating area featuring a community-inspired tile mosaic, a small nature-inspired playground, exercise equipment, bicycle parking infrastructure, perimeter gates and fencing, lighting, a landscaped entry plaza featuring Richland Farms community signage, native plantings, thirty (30) shade trees, decomposed granite pathways, and a small parking lot with permeable pavers and entrance bollards. The Rivers and Mountains Conservancy is soliciting proposals from qualified artists or team of artists to provide design and implementation services for an exterior mosaic project within a new park in the city of Compton. The mosaic would be a flat in-ground mosaic, near the entrance of the park and adjacent to Alondra Boulevard (Exhibit B). The approximate dimension of the mosaic is expected to be twelve feet-six inches (12'6") wide by fifteen feet (15') long. The mosaic dimensions may be adjusted to allow for a full paving unit to be installed around all edges of the mosaic. Work would consist of design as well as production of work on-site, which must be executed by experienced artist(s). The selected Contractor must properly prime and prepare any area approved for painting and a high-quality exterior varnish will be required to secure the longevity of the mosaic(s). The goal of the project is to create a piece of public art for an outdoor environment that reflects the spirit of the City and history of Richland Farms community. The anticipated budget for the ensuing contract is $30,000, inclusive of materials and labor, and the estimated contract term is three (3) months with final installation and acceptance in April 2025. The most highly qualified Contractor is expected be selected and the contract awarded in January 2025 with a start date no earlier than January 7, 2025. The executed Agreement may be formally amended to accommodate schedule conflicts or any unexpected costs associated with the services, by mutual consent of the RMC and the Contractor. A variation of the terms (i.e., change in project representative, change in budget) requires mutual consent from the RMC and Contractor. No verbal understanding, agreement, or amendment not incorporated into the Agreement is binding on either party The anticipated budget for the ensuing contract is $30,000, inclusive of materials and labor, and the estimated contract term is up to four (4) months with final installation and acceptance in April 2025. The most highly qualified Contractor is expected be selected and the contract awarded in January 2025 with a start date no earlier than January 1, 2025.
Award
Playgrounds / Parks / Athletic Fields
$30,000.00
Public - County
Outdoor Lighting, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2025
February 6, 2025

Alondra Blvd, Compton, CA
Related To This Project
Compton, CA
Bid Date: Dec 03 2024
Compton, CA
Bid Date: Jan 31 2025
Compton, CA
Bid Date: Jan 28 2025
Compton, CA
Bid Date: Mar 18 2025
Compton, CA
Bid Date: Mar 31 2025
Compton, CA
Bid Date: Nov 25 2024
Compton, CA
Bid Date: Dec 03 2024
Compton, CA
Bid Date: Nov 22 2024
Compton, CA
Bid Date: Oct 29 2024
Compton, CA
Bid Date: Oct 29 2024
Compton, CA
Bid Date: Nov 06 2024
Compton, CA
Bid Date: Oct 24 2024
Compton, CA
Bid Date: Oct 08 2024
Compton, CA
Bid Date: Oct 31 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
RFP D/B - Artistic Services for Mosaic Design, Fabrication, and Installation
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.