Published January 27, 2025 at 7:00 PM

Updated January 28, 2025

Site work for a water / sewer project in Vina, Alabama. Completed plans call for site work for a water / sewer project.

The work of providing labor, equipment, and material for the Town of Vina, Proposed Town of Vina Storm Drainage Project - CWSRF Project NO. CS010833-05. The principal items of work are detailed herein below: 1. Installation of 42" HDPE Storm Pipe and 38"x 60" RCP Arch Pipe 2. Storm Inlet Boxes 3. Site Work additional doc acq note: Plans, Specifications and Contract Documents are open to public inspection at the office of Owner, The Vina Town Hall located at 711 Hwy 19, Vina, AL 35593 The Contract may be awarded to the lowest and responsive Bidder. The successful bidder must furnish a Performance Bond for one hundred (100%) of the bid amount and a Payment Bond for one hundred (100%) percent of the bid amount and must secure his bond from a bonding company's representative or agent in the State of Alabama. No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving the Bids. The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 90 consecutive calendar days total and noted restrictions shall be strictly observed. LIQUIDATED DAMAGES WILL BE ASSESSED IF CONTRACT TIME IS EXCEEDED. The Contractor may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages. The Owner reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner. The contractor shall note that funds for this project are provided through CWSRF (Clean Water State Revolving Funds). All Applicable Federal Guidelines must be met. There will be no Pre-Bid meeting. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing ; Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. DBE/MBE Participation - 2.5% WBE Participation: 3.0% Commodities (Supplies) MBE 4% WBE 11% Contractual (Services) MBE 8% WBE 30% Equipment MBE 5% WBE 20% Construction MBE 2.5% WBE 3% Contract work provides for the contractor to construct the Proposed Town of Vina Storm Drainage Project - CWSRF Project No. CS010833-05 Contract No. VI24 148. A. Work to be performed, but not limited to involves the installation of HDPE Storm Culvert Pipe, Inlet Box, connections and miscellaneous work shall be in accordance with Contract Drawings and Specifications prepared by Utility Engineering Consultants, LLC, 130 Southcrest Drive, Suite 100, Homewood, AL 35210, Phone (205) 951.3838. B. Cleanup, seeding and fertilization of excavation not in pavement shall be incidental to the work. C. Hay bales and protection from the silt runoff are considered incidental to the work and are the responsibility of the contractor to meet all requirements to prevent runoff. D. Installation 6" HDPE Pipe including 14" HDPE for directional boring.

Bid Results

Water / Sewer

$468,165.00

Public - City

Site Work

14

19

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
20
Bidding Soon
538
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

January 1, 2025

Project location map

Multiple Locations, Vina, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.