BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Green Oaks, Illinois. Completed plans call for the renovation of a educational facility.

The Board of Education, Oak Grove School District 68, 1700 O'Plaine Road Green Oaks, IL 60048 will receive sealed bids for: OAK GROVE SCHOOL DISTRICT 2025 TUCKPOINTING & MASONRY REPAIRS ATTN: Jason Udstuen, Director of Business Services The Work shall take place at 1700 O'Plaine Road Green Oaks, IL 60048. The Work includes, but is not limited to, several areas of tuckpointing, building control joint removal/replacement and full brick veneer replacement along with associated masonry flashing. Each Bid must be accompanied by a Bid Guarantee that shall be not less than 10 percent of the amount of the Base Bid, and at the option of the Bidder may be a Certified Check, Bank Draft, or a Bid Bond, secured by a Guarantee or Surety Company. Certified Check must be made payable to the order of Oak Grove School District 68. The Contractor must pay the Prevailing Wage Rates for all work per Illinois Law. It is the policy of Oak Grove School District 68 to provide equal opportunity to all qualified businesses in the awarding of contracts and accordingly promotes the utilization of diversified businesses to the maximum extent feasible in any contract issued against the solicitation to bid. Oak Grove School District 68 reserves the right to reject any or all bids, to waive irregularities in the bidding procedure, or accept the bid that in its opinion will serve its best interest. Any such decision shall be considered final. Oak Grove School District 68 reserves the right to set aside a Bid from a Contractor whom, in the District's opinion, does not exhibit past experience equal to the size and scope of this project. It shall be the bidder's responsibility to ensure that the bids were received at the District Office by District Office personnel at that time. The District shall not be responsible for bids received at the District Office after the deadline regardless of the reason. Any bids received after the previously stated deadline will be returned to the bidder unopened. The bidder shall have a written sexual harassment policy in place in full compliance with Section 2-105 of the Illinois Human Rights Act.

Sub-Bidding

Educational

$200,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
100
Bidding Soon
1,978
All Active Projects
858
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 6, 2025

img_map_placeholder

To Be Determined, Green Oaks, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.