BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2024 at 7:00 PM

Updated December 13, 2024

Site work and paving for a mixed-use development in Hazel Green, Alabama. Completed plans call for site work for a road / highway; road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Description: Madison County is seeking to replace approximately 3,088 feet of 6" AC water main with 6-inch PVC pipe in the Hazel Green area. Madison County is seeking to replace approximately 3,088 feet of 6" AC water main with 6-inch PVC pipe in the Hazel Green area. The Contractor will be responsible for the installation of new main in accordance with the technical specifications. The Contractor shall: o Install temporary erosion control devices; o Install approximately 2,908 linear feet of new 6-inch PVC water main by open cut, including hydrants and valve assemblies, as shown on the Construction Drawings; o Install approximately 180 linear feet of new 8-inch HDPE water main by horizontal directional drilling, as shown on the Construction Drawings; o Perform open cuts for new main as shown on Construction Drawings; o Pressure test and disinfect the new main and services; o Install new service tubing and connect to the existing meters; o Connect the new main to the existing mains; o Repair driveways, culverts, and roadways to original condition or better; o Abandon existing mains and remove old hydrants and valve boxes; o Maintain appropriate erosion control. throughout construction of the project; o Landscape yards and right-of way to original condition or better; o Remove temporary devices (sample taps, blow-offs, erosion control devices) from the site. The existing water lines shall remain in-service during construction, and work shall be performed to avoid any damage and service disruption to the existing mains. The existing mains will remain live until the new mains and services have been successfully tested, and the new main is ready to connect to the existing main. Construction may be performed in phases. All work must be coordinated with Madison County. Question Deadline 12/06/2024 at 3:00 PM CT Questions should be directed, in writing, to Phillip McDoniel at pmcdoniel@madisoncountyal.gov and Jennie Weatherly at jweatherly@madisoncountyal.gov. A pre-bid conference will NOT be held by Madison County. However, a site visit by interested bidders is highly suggested. Please coordinate with Phillip McDoniel at the Madison County Water Department to schedule a site visit prior to bidding. The Madison County Commission reserves the right to award this bid on an all-or-none or item by item basis, to refuse all bids, and to waive technicalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. estimating this project to cost between 125,000 and 200,000

Post-Bid

Water / Sewer

$200,000.00

Public - County

Paving, Site Work

10

8

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
31
Bidding Soon
840
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2024

January 10, 2025

Project location map

Multiple Locations, Hazel Green, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.